Laserfiche WebLink
` s <br />MCFADDEN AVENUE PROTECTED BIKE LANE AND .� <br />I ; BICYCLE BOULEVARD PROJECT d.,E. <br />CITY OF SANTA ANA '�Ig <br />Task 7.4 —100% Final PS&E: Dokken will incorporate all City comments and concerns from the 90% <br />PS&E Submittal as well as the 90% Constructability Review and meet with City staff to review the <br />responses prior to making revisions. Once we have ensured that all final review comments have been <br />addressed to the satisfaction of all reviewers, the 100% Final PS&E for Bidding Package will be <br />submitted to the City with hard copies available as needed. <br />Task 7 Deliverables: 30% Concept Plans and Estimate; Responses to 30% Review Comments; 60% <br />PS&E; Responses to 60% Review Comments; 90% PS&E; Responses to 90% Review Comments; <br />100% Final PS&E for Bidding; Irrigation Calculations and Point of Connection Coordination <br />Task 8 — Bidding Support Services: Dokken will be available during the bidding phase of the project <br />to assist the City with providing responses to bidder inquiries and an analysis of the bids as needed. <br />Task 8 Deliverables: Response to Bidder Inquiries; Bidding Analysis <br />Task 9 -- Construction Engineering Support (Optional Task): Dokken will provide a cost <br />proposal for construction engineering support services during the construction phase. <br />Task 9 Deliverables: Pre -Con Meeting Preparation; Response to Requests for Information; Submittal <br />Reviews; CCO Package Preparation; As -Built Plans <br />D®KKEN Page 1 5 <br />NNGINUrRINe <br />