Laserfiche WebLink
r <br />City of Camarillo <br />Contract No. 2018-43 <br />Full Capture Storm Drain Inlet Trash Device Project <br />Contract(s) Value: $170,000 / year <br />Date: 2017 — Present <br />Contact: Jessica Ouelette — Stormwater Program Manager <br />Phone & Email: 805.388.5391 / jessicaouellette@caaprofessionals.com <br />Address: 601 Carmen Drive, Camarillo CA 93010 <br />Summary: Ocean Blue currently <br />maintains 2 separate contracts for <br />the City of Camarillo. The first is <br />for Connector Pipe Screen <br />Installation, and the other is for On - <br />Storm Drain Catch Basin Inspection <br />and Maintenance <br />Storm Drain Maintenance: In <br />2019, Camarillo decided to switch <br />their Catch Basin maintenance <br />contractor and signed agreement <br />(MC-2019-4) with Ocean Blue. This <br />3-year agreement allowed Ocean <br />Blue to inspect & clean the <br />thousands of city catch basins. To <br />efficiently conduct the work, we <br />use our in-house fabricated truck. <br />At the end of each cleaning we <br />submit reports/pictures for every <br />single basin. While the actual work <br />is important, we also understand <br />the importance of these reports in <br />regards to the City's permit <br />compliance. <br />CPS Installation: For many years <br />before signing this agreement, <br />Ocean Blue has been installing small <br />quantities of Connector Pipe Screen <br />(CPS) units for Camarillo. After the <br />quantities surpassed the purchase <br />order limits, Camarillo signed <br />agreement SD-5032 with Ocean <br />Blue. SD-5032 gave Ocean Blue a <br />contract for $70K solely for the <br />installation of CPS units. <br />Emergency Response: Ocean Blue <br />also responds to flooding issues <br />during heavy rain events to mitigate <br />flooded areas. Late last year, we <br />responded to a sewage overflow at <br />their wastewater plant. <br />Page 17 of 29 <br />