My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
UNITED STORM WATER, INC. (6)
Clerk
>
Contracts / Agreements
>
U
>
UNITED STORM WATER, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:13:00 PM
Creation date
6/23/2021 10:01:18 AM
Metadata
Fields
Template:
Contracts
Company Name
UNITED STORM WATER, INC.
Contract #
A-2021-097-02
Agency
Public Works
Council Approval Date
6/15/2021
Expiration Date
6/14/2024
Insurance Exp Date
12/31/2022
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is a proposed outline of activities that will be undertaken for executing this project: <br />tPX 'et jviy g > : <br />Pro osed Member to Perforrri Acfrvi�y << i <br />1. <br />Submit W-9 Form <br />Administrative Personnel <br />2. <br />Submit Insurance Requirements <br />Administrative Personnel <br />3. <br />Attend Contract Kick -Off Meeting <br />Key Personnel <br />4. <br />Obtain Storm Drain Maps from Public Works Representative <br />Project Manager, Ramon Menjivar <br />5. <br />Meet With Public Works Representative Regarding the City's <br />Prioritized Schedule <br />Project Manager, Ramon Menjivar <br />6. <br />Perform Project Planning <br />Project Manager, Ramon Menjivar & Dana De <br />Guzman <br />7. <br />Submit Work Schedule to Public Works Representative <br />Project Manager, Ramon Menjivar <br />8. <br />Obtain Permits (Encroachment) <br />Project Manager, Ramon Menjivar <br />9. <br />Submit Traffic Plans to City' Engineer if/as Required <br />Project Manager, Ramon Menjivar <br />10. <br />Conduct Field Tailgate Meeting/Training <br />Project Manager, Ramon Menjivar <br />11. <br />Perform Maintenance Requests <br />Service Staff <br />12. <br />Perform Quality Assurance During Maintenance <br />Field Supervisors, Jose Ponce and/or Cesar <br />Garcia <br />13, <br />Collect & Compile Required Documentation <br />Dana De Guzman & Administrative Personnel <br />14. <br />Provide Required Documentation to Public Works Representative <br />Project Manager, Ramon Menjivar <br />15. <br />Obtain Inspector Buy -Off of Services Performed <br />Project Manager, Ramon Menjivar <br />16. <br />Submit Invoicing <br />Project Manager, Ramon Menjivar <br />Permits <br />United will obtain the project required encroachment and traffic permits prior to the start of work. All other project related <br />licenses and certifications required for the lawful execution of the contract are already in place. <br />Equipment <br />United will provide confined space entry equipment as needed at each site. Confined space entry equipment will include at a <br />minimum an air monitor, air blower (if existing ventilation is insufficient), parachute harness, safety harness, and a tripod man <br />lift hoisting device for lifting employees out of the space. Personnel are safety watch trained in first aid and cardiopulmonary <br />resuscitation (CPR) with effective means of communication between employees inside a confined space and cell phones will <br />be onsite. A Site Health & Safety Plan will be reviewed by all crew members and signed acknowledging compliance while <br />working at the site. A Confined Space Entry Permit will be completed for each permit required site where entry is required. <br />Protocol <br />All work will be performed in a timely manner per a schedule and route that has been pre -approved by the Director of Public <br />Works. There will be a Field Supervisor assigned to this project who will oversee all services rendered to the City. The Field <br />Supervisor will ensure compliance with all applicable laws (federal, state, and local), ordinances and regulations, and will <br />coordinate with United's Project Manager to ensure that all customer needs are satisfied, and will approve or reject the work <br />performed and methods used. <br />Work will be performed in a manner that abides by all OSHA, and City safety codes, policies, and procedures as well as all <br />local, state, and federal environmental and storm water regulations. The appropriate safety equipment and procedures will be <br />utilized for the protection of all service staff, customer staff, and the public. No discharges of any material will be allowed to <br />enter the storm water conveyance system and United's service staff will be equipped with appropriate spill kits in the event of <br />61 <br />14000 E. Va11e Blvd ind..stry, CA 1�1S;i <br />I!t;v�vv un;rer..{ .'ioiinw-ite ..,:,i <br />
The URL can be used to link to this page
Your browser does not support the video tag.