Laserfiche WebLink
Santa Ana <br />o Schedule <br />• Upon request as needed. <br />Storm Drain Facility Maintenance & Cleaning <br />o Experience <br />• United Storm Water 22 years of experience; sister company/subcontractor, United Pumping <br />Service, 51 years of experience <br />• Numerous public agencies throughout California including the City of Santa Ana <br />• Design, fabricate, and install DrainPab Filter Inserts, ARS, and CPS devices <br />• Have installed the metal gates called out in this RFP for the City of Santa Ana during past <br />contract <br />o Schedule <br />• Dry Season: Inspect annually (May 1— September 30) <br />• Storm Season: Inspect monthly (October 1 — April 30) within (7) days of each storm season <br />month or as directed. Cleaning of catch basins retrofitted with inserts (ARS and/or CPS) will <br />be performed when filled to 40% capacity and all other catch basins will be cleaned as <br />needed. <br />• Annually: 80% of all storm drain facilities will be cleaned and maintained. <br />• Bi-Annually; 100% of all storm drain facilities will be cleaned and maintained. <br />• Metal Gates: Sales estimate will be provided upon request for metal gate installation. <br />On -Call Operations, Maintenance & Repair Services (First Street Lift Station) <br />o Experience <br />• United Storm Water 22 years of experience (maintenance); sister company/subcontractor, <br />United Pumping Service, 51 years of experience (maintenance); subcontractor, Multi W <br />Systems, 35 years of experience (pump operation and repairs) <br />• Numerous public agencies throughout California including the City of Santa Ana <br />Schedule <br />• On -call 24-hours a day, 7-days a week. <br />• United will respond to lift station issues within (1) hour of initial request. <br />The Project Manager assigned to this project will be available twenty-four hours per day, seven days per week throughout the <br />duration of the contract including weekends and legal holidays. Hazardous waste disposal, and scheduled storm drain facility <br />maintenance and cleaning will be performed between 8:00 a.m. and 5:00 p.m. Mondays through Fridays. Emergency <br />response services will be provided as -needed on a 24-hour basis. <br />Fee Proposal <br />See separate attachment labeled "Fee Proposal" including fee proposal and Contract Comparison Form (RFP Appendix <br />Attachment 4). <br />14000 E s:a•'hy, P I v d . .n d i tr . <br />