Laserfiche WebLink
Ramon Menjivar <br />Senior Project Manag <br />Experience Since 1999 <br />Training <br />• CPR & First Aid Training <br />• Bloodborne Pathogens Training <br />• 40-Hour HAZWOPER Training <br />• Confined Space Entry Certification <br />• Traffic Control Training Per Caitrans Standards <br />• DOT HM-126F. HM-180 & HM-181 Certification <br />Management Experience <br />With experience at United Storm Water since 1999, Mr. Menjivar entered his position as Senior Project Manager after <br />advancing from six years of field experience as a Technician, and two years of experience as BMP Fabrication and <br />Installation Manager. <br />Mr. Menjivar's management experience includes the organization of road closure permits, projects involving hazardous <br />material remediation, supervising tank removal and tank cleaning projects, pump house cleaning, sewer and storm <br />drain cleaning, and development and installation of United fabricated structural BMP devices. Mr. Menjivar is also <br />noted for demonstrating leadership through professionalism, job ownership, commitment, teamwork, ethical behavior, <br />and well-rounded project experience. <br />Examples of Related Project Experience <br />1. State of California Department of Transportation (Caitrans), Los Angeles District 7 (2012-2014, 2014-2016, <br />2016-2018, 2018-2020, 2020-Present)— Services are performed throughout the year for cleaning 8,500 storm <br />drains on a scheduled basis, yearly cleaning of trouble storm drain lines, and yearly/as needed maintenance <br />of 52 pump stations existing on highways in Los Angeles County. The cleaning frequency of storm drains per <br />this contract is court ordered to be performed at the end of the dry season and before the wet season (within <br />75 working days). This contract includes the management of approximately 1,200 tons of hazardous storm <br />drain waste, documentation of the weight and volume of waste extracted from each drain compiled in a report <br />to depict trends over the life of the contract, waste profiling, and disposal. During cleaning operations United <br />Storm Water plans and activates over 300 freeway static lane closures. <br />2. City of Long Beach (2005-Present)— Serves as Project Manager for Storm drain conveyance system <br />maintenance including catch basin cleaning (3,800), installation of storm drain BMPs devices (Automatic <br />Retractable Screens, Connector Pipe Screens, DrainPac), as -needed emergency response (hazardous and <br />non -hazardous), storm drain pipe cleaning, and pump station cleaning. <br />3, City of Santa Ana (2005-2021)— Served as Project Manager for citywide catch basin cleaning (scheduled and <br />as -needed), pump house inspection and maintenance, emergency response services, installing Automatic <br />Retractable Screen Covers, and Connector Pipe Screens, and bus stop sanitizing during the Covid-19 <br />pandemic. <br />