My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARDY AND HARPER, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
HARDY AND HARPER, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 3:25:10 PM
Creation date
6/30/2021 3:22:12 PM
Metadata
Fields
Template:
Contracts
Company Name
HARDY AND HARPER, INC.
Contract #
P 21-6907
Agency
Public Works
Council Approval Date
6/1/2021
Expiration Date
3/22/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY 4F SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number _21-6907 - Local Street Preventative Maintenance Project Change Order Number 2 <br />To Hardy and Harper Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included In the plans and <br />specifications on this contract, <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVEO BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment Is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. Compensate the contractor for loss of production and remobilization of installation of speed <br />hump due to vehicle blocked the construction location on Shelton Street. (PCO#04) <br />Final cost = $7,127.54 <br />TOTAL COST: $7.127.54 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.