My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-04-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
FULL AGENDA PACKET_2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 9:55:55 AM
Creation date
7/8/2021 4:33:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Electric Bike Trail —Phase 2, Sandpninte Park <br />RFP No.20-129 <br />Task 3: Construction Documents (85% and 100% plans) <br />Construction Documents shall include finalizing Design Development plans, obtaining plan check approvals and <br />securing permitting. This includes the provision of detailed engineering and construction drawings that will serve as the <br />basis for both bid advertisement and construction. IDS shall also provide updated cost estimate reflecting finalized <br />plans, materials, systerns, details of construction, and known or anticipated changes in the bidding market relative to <br />the project. <br />Engineering and design required tasks shall include, but may not be limited to: <br />• Plans and Specifications (Contract Documents) shall be reviewed (with the City staff) at 85% and 100%. <br />• Updated Cost Estimates. Project phasing may need to be considered and Contract Documents may need to be <br />structured accordingly pending available construction funding. <br />• Review sets s provided in PDF format. <br />• IDS will provide final plans in Micro Station V8i format and PDF format. <br />• IDS will prepare the Technical Specifications in Microsoft Word, using the City provided boiler plate. <br />• Quantity calculations shall be provided for items that are applicable to this project, IDS will prepare and provide <br />cost estimates at milestone stages. <br />• A list of contract pay items with the descriptions and estimated quantities shall be provided for inclusion in Bid <br />Proposal and Definition of Bid Items of City Boiler Plate. <br />• All plan sheets and the title sheet of the specifications, calculations and reports shall he signed and stamped, <br />including license number and expiration date, by IDS' State of California Registered Professinnal Engineer in the <br />field of Electrical Engineering responsible for the project. <br />• Coordinate plan check with the City of Santa Ana and other agencies including, but not limited to, City of Santa <br />Ana Public Works Design and Parks Recreation & Community Services Division. <br />Task 4: Bid Advertisement, Construction Administration, Record Drawings: <br />If requested, IDS shall provide support during bid advertisement and construction, and provide record drawings as <br />described below - <br />Bid Advertisernent, <br />If requested, IDS shall: <br />• Respond to written Requests for Information (RFI) to provide clarification or resolve discrepancies in the contract <br />documents. Responses shall be completed within three (3) working days, <br />• Review addenda, and <br />• Attend pre -bid meeting. <br />Construction Support <br />All construction support work shall be at the request of and coordinated by the City of Santa Ana. As requested, IDS <br />shall - <br />AA r GRDUP Pasre 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.