Laserfiche WebLink
2. THE PROJECT <br />The project area is approximately 3S acres +/- in size and includes the following key program elements: <br />Renovation to the existing animal holding building <br />Renovation to Amazon's Edge Habitat to house Giant River Otters in a themed naturalistic <br />riverine environment <br />New Howler Monkey Habitat <br />• Primate Trail Systems <br />• New Underwater View Area of Otters for Guests <br />Redevelopment of the existing Deck View Shelter <br />New/enhanced Visitor Pathways and Landscape <br />• Water Filtration System (LSS) for the Otter Pools <br />Misc. rail systems, fencing, irrigation, lighting, and site furnishings <br />Coordination with Interpretive Graphics and Elements <br />Budget: We understand the Construction Budget to be $3.6M +/- exclusive of soft costs and any <br />other direct Owner/City costs. <br />k3EYd•]L�•1�G1;1il <br />Our Team has completed Preliminary Design and Conceptual Design (Tasks 1 and 2), Design <br />Development (Task 3), Construction Documents (Task 4) and Permitting (portion of Task 5.1) to date. <br />See the original 12/2016 Agreement for a description of these work phases. <br />CLR will provide Bidding and Construction Administration phase services for the project described above <br />including architecture; landscape architecture; exhibit design; caging design; and coordination of <br />structural engineering; MEP engineering; civil, and life support system engineering. <br />TASKS.1: Bidding <br />The key Design Team memhers will participate in a pre -hid meeting(s) as necessary in ardor to present <br />the project Lo bidders and answer questions. We feel LhaL it is critical wish the uniqueness of zoo <br />projects such as this, that we participate in giving bidding contractors the "big picture" as well as answer <br />detailed questions. The Design Team will also be available by telephone/web-hased meeting during the <br />hid prncrsc to nnswrr qumtiont. <br />Key Tasks- <br />• Participate in pre -bid walk-thru and interview contractors as needed <br />• Review and respond to contractor RR's during the bid period <br />• Issue clarifications to the Bid Documents/Addendum if necessary, for both contractors and City <br />Agencies as part of the permitting process <br />• Review Substitution Requests submitted by the contractors <br />• Assist with analysis of construction bids and participate with the Zoo/CM to make final <br />recommendations <br />TASK5.2: Construction Administration <br />The unique nature of zoo facilities and construction requires the experienced involvement of CLR as well <br />as the day to day availability of our local engineering firms. It is anticipated that CLR will attend <br />approximately one meeting per month on -site at critical stages during construction. The CLR Team will <br />provide the necessary services outlined below. <br />City Council 24 — 13 4/20/2021 <br />