My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-04-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
FULL AGENDA PACKET_2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 9:55:55 AM
Creation date
7/8/2021 4:33:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u Inform the Owner's operational staff of the engineering principles and the original <br />design intent. <br />o Assist or provide information during testing and start-up and acceptance of systems <br />from the contractor. This is sometimes referred to as "commissioning" which we define <br />to mean "to put into active service." Our service consists of part-time visual <br />observations during field visits and does not relieve the contractor of responsibility for <br />completeness of construction. <br />• Additional LSS Services (Not included in this proposal but can be added upon request): <br />LSS Ooerating Manual: Prepare a text only operating manual to summarize basic system <br />operations including filling pools, draining pools, starting the system, backwashing <br />filters, and other routine operations. The manual will also have recommendations for <br />system and component maintenance. No additional trips have been included for <br />development of this manual. <br />Compensation: <br />Professional Fee $9,900 <br />Y Estimated Reimbursable Expenses: $150 <br />Additional Startup Service: TJP would have a representative onsitc for the three-day <br />startup and initial operations period for the new system to observe progress and <br />provide technical support as the Contractor runs the system. During this time, we can <br />also include the Zoo's operations staff that will be running the system in startup <br />activities to assist with training. <br />Compensation: <br />y Professional Fee: $6,60o <br />Estimated Reimbursable Expenses! $1,500 <br />D. CLR assumes the Contractor or the City will provide special inspections and testing services <br />required by local agencies. <br />E. It Is assumed that the City will print and distribute Bld Documents at their own expense, or the <br />expense shall be covered by bidders. <br />F. We anticipate utilizing the Consultant Agreement, City of Santa Ana (either new or extension to <br />our 12/21/2016 Agreement) Standard Form of Agreement between Owner and Architect, as our <br />contract. This letter will be attached to that document and will become part of the Agreement- <br />G. Geotechnical Engineering services are not included. <br />H. Interior Design Services are not included. <br />I. Interpretive Design Services are not included. <br />City Council 24 — 16 4/20/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.