My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALTRANS
Clerk
>
Contracts / Agreements
>
C
>
CALTRANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 2:50:01 PM
Creation date
7/14/2021 9:44:10 AM
Metadata
Fields
Template:
Contracts
Company Name
CALTRANS
Contract #
A-2021-124
Agency
Public Works
Council Approval Date
7/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
usability. Further requirements and guidance are provided in Title 24 of the California Code of <br />Regulations. <br />17. ADMINISTERING AGENCY shall provide a full-time public employee to be in responsible <br />charge of each PROJECT. ADMINISTERING AGENCY shall provide or arrange for adequate <br />supervision and inspection of each PROJECT. ADMINISTERING AGENCY may utilize <br />consultants to perform supervision and inspection work for PROJECT with a fully qualified and <br />licensed engineer. Utilization of consultants does not relieve ADMINISTERING AGENCY of its <br />obligation to provide a full-time public employee to be in responsible charge of each PROJECT. <br />18, Unless otherwise provided in the PROGRAM SUPPLEMENT, ADMINISTERING AGENCY <br />shall advertise, award, and administer the PROJECT construction contract or contracts. <br />19. The cost of maintenance, security, or protection performed by ADMINISTERING AGENCY <br />or contractor forces during any temporary suspension of PROJECT or at any other time may not <br />be charged to the PROJECT. <br />20. ADMINISTERING AGENCY shall submit PROJECT -specific award information to STATE's <br />District Local Assistance Engineer, within sixty (60) days after contract award. <br />21. ADMINISTERING AGENCY shall submit the final report documents that collectively <br />constitute a "Final Project Expenditure Report", LAPM Exhibit 17-M, within one hundred eighty <br />(180) days of PROJECT completion. Failure by ADMINISTERING AGENCY to submit a "Final <br />Project Expenditure Report", within 180 days of project completion will result in STATE <br />imposing sanctions upon ADMINISTERING AGENCY in accordance with the Local Assistance <br />Procedures Manual. <br />22. ADMINISTERING AGENCY shall comply with the Americans with Disabilities Act (ADA) of <br />1990 that prohibits discrimination on the basis of disability and all applicable regulations and <br />guidelines issued pursuant to the ADA. <br />23. The Governor and the Legislature of the State of California, each within their respective <br />jurisdictions, have prescribed certain nondiscrimination requirements with respect to contract <br />and other work financed with public funds. ADMINISTERING AGENCY agrees to comply with <br />the requirements of the FAIR EMPLOYMENT PRACTICES ADDENDUM, attached hereto as <br />Exhibit A and further agrees that any agreement entered into by ADMINISTERING AGENCY <br />with a third party for performance of work connected with PROJECT shall incorporate Exhibit A <br />(with third party's name replacing ADMINISTERING AGENCY) as parts of such agreement. <br />24. ADMINISTERING AGENCY shall include in all contracts and subcontracts awarded when <br />applicable, a clause that requires each subcontractor to comply with California Labor Code <br />requirements that all workers employed on public works aspects of any project (as defined in <br />California Labor Code sections 1720-1815) be paid not less than the general prevailing wage <br />rates predetermined by the Department of Industrial Relations as effective at the date of <br />contract award by the ADMINISTERING AGENCY. <br />Page 4 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.