Laserfiche WebLink
UNDERSTANDING OF NEED <br />provide inspection to verify the proper size and RMA Group staff will be able to very quickly reproduce <br />placement of reinforcing steel and embedded anchors. any relevant reports or laboratory test results using <br />LIMS reducing delays that otherwise might result <br />We will also verify steel mill test reports, sample <br />material (if required), and inspect the fabrication. <br />Written progress reports will be provided. <br />Reinforced concrete inspections will be performed <br />continuously during the placement of concrete to <br />verify that the class of concrete ordered is being <br />delivered and conforms to the specifications, drawing <br />and/or code requirements. Slump tests, entrained air, <br />temperature, unit weight (when required) and concrete <br />sampling will be performed during all concrete <br />placements. The samples will be delivered to our <br />local laboratory, cured in a controlled environment <br />and tested for compression strength. <br />Structural steel and welding inspections are performed <br />to assure that proper quality control is exercised at <br />the shop and field. The certified welding inspector <br />will perform inspections before, during, and after <br />welding. We will provide an inspector that has been <br />certified by County of Las Angeles for welding. The <br />observation would consist of inspection of all welds <br />made in the shop and / or field for compliance of the <br />approved plans and job specifications. The inspector <br />shall make a systematic record of all welds, including <br />a list of defective welds and a manner of correction <br />of defects. The inspector will check the material, <br />equipment, details of construction and procedures, as <br />well as the welds. Our inspectorwill perform inspection <br />during fit up and fabrication of structural steel to <br />verify the materials utilized are properly marked and <br />traceable. The inspector will collect mill certifications <br />for the materials and inspect joint details to verify <br />conformance at each connection. Non Destructive <br />testing of the completed welds will be performed <br />as required. The inspector may use Ultrasonic(UT), <br />Magnetic Particle(MT) or Dye Penetrant(PT) as <br />appropriate to inspect completed welds and assure <br />the adequacy of the welding <br />PROJECT CLOSE-OUT <br />Upon project completion, the City may need closeout <br />documents or testing professional staff will be able to <br />recall all daily inspection reports and all laboratory test <br />results using our LIMS software. This allows for easy <br />access to information and inspection summaries. <br />Our testing and inspection summaries for the entire <br />project can be put together efficiently. If there are any <br />outstanding issues as the project comes to a close, <br />from having to track down physical files. <br />QUALITY ASSURANCE AND QUALITY CONTROL <br />Quality is an intrinsic part of RMA Group's operations. <br />It is the first topic on every management agenda, and <br />it permeates the daily activities of every employee. Our <br />internal Quality Control program reflects our specific <br />commitment to go beyond mere compliance with basic <br />requirements. <br />The program is a major piece of RMA Group's mission: <br />to provide quality laboratory testing services meeting <br />a broad range of our clients' needs. The objective of <br />RMA Group's Quality Control Program is to ensure <br />that the test data we provide meet our clients' quality <br />objectives. In most cases, the aspects of quality that <br />concern our clients most are the accuracy, precision, <br />and completeness of our test results. <br />We maintain control of our test results through the use <br />of technical oversight by registered civil engineers, <br />internal audits of project documentation, our continual <br />participation in reference sample programs and <br />through training and proficiency evaluations for all of <br />our technical staff. <br />All of the field and laboratory tests performed for <br />projects will be performed under the responsible <br />charge of a registered civil engineer who will provide <br />technical oversight of RMA Group's field and <br />laboratory activities. Technical oversight includes <br />reviewing test data and reports for precision, accuracy <br />and completion and monitoring the procedures <br />and equipment utilized to perform testing to verify <br />conformance with relevant specifications. Laboratory <br />staff is directed to immediately report unusual <br />observations or findings to the engineer in responsible <br />charge of the laboratory. This allows the engineer to <br />evaluate the test procedure and results and make a <br />determination regarding the validity of any unusual <br />findings. <br />RFP NO: 20-111 1 MATERIALS TESTING & SPECIAL INSPECTION SERVICES <br />Page 9 I CITY OF SANTA ANA 120-1600-P I SEPTEMBER 30, 2020 <br />M07 <br />RMA Group <br />