Laserfiche WebLink
RELEVANT PROJECT EXPERIENCE <br />COUNTY OF SAN BERNARDINO STREET <br />IMPROVEMENTS ISANBERNARDINO,CA <br />Our services include quality control investigative services <br />for projects and typical geotechnical services for road <br />paving projects. These include pavement reconstruction, <br />maintenance resurfacing, paving of dirt roads, geology <br />investigations for road stability, ground penetrating radar <br />surveys with reports for depth analysis of existing sub -grade <br />layers, pavement layers, and utilities, and obtaining core data <br />and soil samples. <br />SERVICES PROVIDED <br />ON - CALL CONSTRUCTION MATERIALS & <br />SOILS TESTING SERVICES I WEST COVINA, CA <br />The City of West Covina's capital improvement program (CIP) <br />budget reflectsthe City's commitmentto public safety; investing in <br />the communitys infrastructure, and providingfinancialstabilityfor <br />the City. Projects detailed within their CIP include street <br />improvements, tmffic safety enhancements, storm drain <br />improvements, sewer improvements, facility improvements, <br />park improvements, and assessment district improvements. <br />As a as -needed consultant for construction materials and soils <br />testing, RMA Group performs earthwork testing and observation, <br />compaction testing of subgmde and utility trench backfill, <br />reinforcing steel and reinforced concrete testing, asphalttesdng, <br />batch plant inspection and testing, and any other tests requested <br />by the City. <br />RFP NO:20.1111 MATERIALS TESTING& SPECIAL INSPECTION SERVICES <br />Page 12 CITY OF SANTA ANA 120-16WP I SEPTEMBER 30,2020 <br />INLAND EMPIRE UTILITIES AGENCY <br />ON -CALL CONTRACT I FONTANA I RANCHO <br />CUCAMONGA I CHINO, CA <br />RMA Group has been providing geotechnical engineering during <br />design and construction as well as materials testing to Inland <br />Empire Utilities Agency since 1998. During this time, RMA Group <br />worked on all five of this agenWs water treatment plants, the <br />RP Administration and Operation Building, Peaker Plant, and <br />Wetland Restoration Project. <br />During our tenure, RMA Group has been consistently able to <br />meet the scheduling and staffing assignments to complete <br />the range of services. On -site, RMA Group personnel provided <br />inspection with detailed documentation that included <br />description of the work in progress by each trade or consultant, <br />approved submittals, change orders, bulletins, requests for <br />information or clarification, and correction notices or notices <br />of non-compliance issued. <br />0 <br />51 <br />RF <br />as <br />in, <br />re <br />