Laserfiche WebLink
Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services <br />for City of Santa Ana, RFP No. 20-111 <br />APPENDIX A <br />Caltrans District 11, Construction Materials Sampling and Testing Services, Contract EA- <br />11A2466 & 11A2479 (continued from prior EA-11A2026), San Diego County, CA. Project <br />Manager and Lead Material Engineering Tester. Manages and coordinates field and laboratory <br />activities and provides consultation with Caltrans Resident and Materials Engineers. Services have <br />included sampling of subgrade soils, aggregates, HMA, oil, and concrete; batch plant inspections for <br />HMA and concrete plants, and laboratory testing. Our materials testers perform soils, aggregate <br />base, HMA, concrete sampling and testing in the field on various EA, and perform HMA testing in <br />our AASHTO and Caltrans-accredited laboratory; augmenting the Caltrans District 11 laboratory. <br />Imperial County Department of Public Works, On -Call Soils and Geotechnical Engineering <br />and Materials Testing, Imperial County, CA. Geotechnical Engineer responsible for developing <br />Quality Assurance Plans, review of AC mix designs, preparation of AC and aggregate lab testing <br />programs, and pavement consultation during roadway construction projects. <br />City of Long Beach, Runway 7R-25L, 811-26L, R12-30, Long Beach, CA. Oversaw QA Testing <br />and Inspection Services for improvements to various runways and performed Phase II Pavement <br />Condition Surveys. Designed pavement sections for highway and airfields and developed and <br />reviewed pavement rehabilitation programs. <br />County of Imperial, On -Call Services, LTA Phase 1 AC Overlay, Imperial County, CA. Project <br />Manager/Pavement Engineer. Managed the repair of pavement failure, placement of two -inches of <br />AC hot mix overlay, and placement of Type 2 slurry seal coat at 13 locations. Responsible for <br />oversight and coordination of field and laboratory testing for subgrade, base, AC overlay, chip seal, <br />and slurry seal. Provided recommendations for pavement section and subgrade stabilization at <br />Horne Road. Implemented QC program for chip seal, slurry seal, cold -in -place recycling, and AC <br />overlay. <br />University of California, San Diego (UCSD), Various Projects, San Diego and La Jolla, CA. <br />Project Manager for construction materials testing and special inspection services for various UCSD <br />projects including UCSD 5079 Mesa Pedestrian Bridge, 4981 MCLJ EVS, 5020 ED RIC, 5240 <br />Soccer Field Conversion, 4930 EMF Building, 5094 Thornton Endoscopy Renovation, 5085 Muir <br />Biology Building Renovation, 5250 Price Center West Renovation, 5166 Barreiro Laboratory <br />Renovation, 5262 Outback Adventures, 4484 MCLJ Outpatient, MC18111 JMC Family Lounge, <br />MC18144 Network Antenna, MC 18070 JMC SPD Remodel, MC 17110 SCVC. <br />University of California, San Diego (UCSD) Jacobs Medical Center, Various Projects, La Jolla, <br />CA. Deputy Project Manager, providing engineering and management support for field inspectors <br />and material testers. He provided training for field personnel in utilizing UCSD's cloud system. Dr. <br />Stiady oversaw the special inspection for structural welding and high strength bolting activities, <br />concrete placement inspection and testing, and rebar inspection, sampling, and testing. <br />San Diego Community College District, Building A, D, T Renovation, San Diego, CA. Deputy <br />Project Manager managing inspection activities with contractor work in -progress and building <br />rapport with the Inspector of Record. Project scope includes special inspection for structural <br />welding, high strength bolting, fiber -reinforced polymer (FRP) installation, concrete placement, rebar <br />inspection, post -installed anchors, ceiling wires, and masonry placement. The renovation of the "A" <br />building upgraded 52,000 square feet of Student Services and Administration Office space. <br />Renovations included seismic and structural upgrades, removal of portions of the original structure <br />to enhance the new plaza area, full interior demo and modernization build -out. The "D" building <br />component of the project replaced the existing roof deck with a new rooftop deck, existing planters, <br />and raised areas of the roof will be transformed into student and faculty gathering areas. The <br />renovation of the "T" building involved approximately 77,000 square feet of space, creating new <br />homes for the engineering department and other technical specialties. Renovations included <br />seismic and structural upgrades, full interior demo and modernization build -out. <br />�J[LEINFELQFR <br />M'N210924,001P James Stiady 12 <br />