Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services
<br />for City of Santa Ana, RFP No. 20-111
<br />APPENDIX A
<br />License/Certification
<br />Juan Le Roy, ICC, NICET, AASHTO, ACI, CTMs
<br />ICC Special Inspector:
<br />Technician/Inspector
<br />- Prestressed/Post
<br />Mr. Le Roy has been in the construction industry performing
<br />tensioned
<br />construction materials testing, inspections, and project
<br />- Reinforced Concrete
<br />management oversight on projects as a supervisor for laboratory
<br />- Soils
<br />and Feld services for over 19 years. He has a wide range of
<br />-Spray-applied
<br />experience in testing soils, asphalt, concrete, steel, and masonry.
<br />Fireproofing
<br />In his current role as Operations Manager, he supervises and
<br />- Structural Masonry
<br />trains field materials testers and plant inspectors on Caltrans,
<br />- Structural Steel and
<br />AASHTO, ASTM, USACE, and DSA Standards. Mr. LeRoy has
<br />Bolting
<br />held over 40 Caltrans certifications before the integration of
<br />NICET Soils, Concrete,
<br />AASHTO into Caltrans, and has been performing Caltrans
<br />Asphalt, Level II
<br />materials testing and plant inspections since 2002 in Districts 7, 8,
<br />11, and 12. He served in a field supervisor role from 2009 until
<br />AASHTO Methods: T166,
<br />2018 when he took on an operations/project management role
<br />T209, T269, T275, T308
<br />responsible for providing QA/QC management for projects
<br />ACI Concrete Strength and
<br />consisting of field inspection, laboratory report review, project field
<br />Field Testing Technician,
<br />supervision, and providing technical support to the project team.
<br />Level I
<br />CTM Certified: 105, 106,
<br />Relevant Project Experience
<br />125, 201, 202, 206, 207,
<br />Orange County Public Works (OCPW), As -Needed Materials
<br />216, 217, 226, 227, 229,
<br />Testing & Inspection and Geotechnical Engineering and
<br />231, 301, 304, 308, 309,
<br />Services, Orange County, CA. Materials Tester. On -call contract
<br />366, 370, 382, 504, 518,
<br />for materials testing and inspection and geotechnical engineering
<br />521, 523 524, 533, 539,
<br />services for OCPW. Kleinfelder is providing materials testing and
<br />540, 543, 556, 557
<br />inspection services in support of OCPW's Quality Assurance (QA)
<br />program for construction of new or rehabilitation of existing
<br />Special Training
<br />roadways, flood control channels, parks, or other infrastructure
<br />Nuclear Gauge Operator
<br />projects. Kleinfelder complies with and all testing is performed in
<br />Training
<br />accordance with OCPW Standards and Procedures, Greenbook
<br />Loss Prevention System
<br />Specifications, Caltrans Standards, ASTM Standards, AASHTO
<br />Safety Training
<br />Standards, and APWA Standards. In addition, Kleinfelder's
<br />Defensive Driver Training/
<br />material testers and laboratories are certified CCRL, AASHTO
<br />Driver's License
<br />resource accreditation, and ASTM D3666. A recent project is the
<br />Oso Parkway Bridge Replacement Project in Aliso Viejo. The
<br />OSHA 10-Hour
<br />project consists of the removal, relocation and adjustment of
<br />(Construction)
<br />existing improvements, excavation and grading, removal and
<br />Confined Space Entry
<br />relocation of existing utilities, construction of new storm drainage
<br />Years of Experience
<br />and storm water pre-treatment and storage system, construction
<br />of curb, gutter and pedestrian walkways and ramps, bridge
<br />19 years total
<br />construction, roadway paving and new overhead signage and
<br />4 years with Kleinfelder
<br />traffic control devices. Services include concrete batch plant
<br />inspections, PCC aggregate sampling and testing, onsite flexural
<br />beam fabrication, and laboratory testing.
<br />City of Long Beach, On -Call Materials Testing and Inspection
<br />Services, Long Beach, CA. Materials Tester. Performs soils,
<br />concrete, and AC inspection and testing per Caltrans standards
<br />and test methods for various street improvements. The work
<br />consists of pavement reconstruction and overlays, constructing
<br />PCC curbs, gutters, driveways, curb ramps, and sidewalks.
<br />�/NFELOER
<br />MW21011+0ciP Juan Le Roy 11 �-
<br />
|