Laserfiche WebLink
Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services <br />for City of Santa Ana, RFP No. 20-111 <br />APPENDIX A <br />License/Certification <br />Juan Le Roy, ICC, NICET, AASHTO, ACI, CTMs <br />ICC Special Inspector: <br />Technician/Inspector <br />- Prestressed/Post <br />Mr. Le Roy has been in the construction industry performing <br />tensioned <br />construction materials testing, inspections, and project <br />- Reinforced Concrete <br />management oversight on projects as a supervisor for laboratory <br />- Soils <br />and Feld services for over 19 years. He has a wide range of <br />-Spray-applied <br />experience in testing soils, asphalt, concrete, steel, and masonry. <br />Fireproofing <br />In his current role as Operations Manager, he supervises and <br />- Structural Masonry <br />trains field materials testers and plant inspectors on Caltrans, <br />- Structural Steel and <br />AASHTO, ASTM, USACE, and DSA Standards. Mr. LeRoy has <br />Bolting <br />held over 40 Caltrans certifications before the integration of <br />NICET Soils, Concrete, <br />AASHTO into Caltrans, and has been performing Caltrans <br />Asphalt, Level II <br />materials testing and plant inspections since 2002 in Districts 7, 8, <br />11, and 12. He served in a field supervisor role from 2009 until <br />AASHTO Methods: T166, <br />2018 when he took on an operations/project management role <br />T209, T269, T275, T308 <br />responsible for providing QA/QC management for projects <br />ACI Concrete Strength and <br />consisting of field inspection, laboratory report review, project field <br />Field Testing Technician, <br />supervision, and providing technical support to the project team. <br />Level I <br />CTM Certified: 105, 106, <br />Relevant Project Experience <br />125, 201, 202, 206, 207, <br />Orange County Public Works (OCPW), As -Needed Materials <br />216, 217, 226, 227, 229, <br />Testing & Inspection and Geotechnical Engineering and <br />231, 301, 304, 308, 309, <br />Services, Orange County, CA. Materials Tester. On -call contract <br />366, 370, 382, 504, 518, <br />for materials testing and inspection and geotechnical engineering <br />521, 523 524, 533, 539, <br />services for OCPW. Kleinfelder is providing materials testing and <br />540, 543, 556, 557 <br />inspection services in support of OCPW's Quality Assurance (QA) <br />program for construction of new or rehabilitation of existing <br />Special Training <br />roadways, flood control channels, parks, or other infrastructure <br />Nuclear Gauge Operator <br />projects. Kleinfelder complies with and all testing is performed in <br />Training <br />accordance with OCPW Standards and Procedures, Greenbook <br />Loss Prevention System <br />Specifications, Caltrans Standards, ASTM Standards, AASHTO <br />Safety Training <br />Standards, and APWA Standards. In addition, Kleinfelder's <br />Defensive Driver Training/ <br />material testers and laboratories are certified CCRL, AASHTO <br />Driver's License <br />resource accreditation, and ASTM D3666. A recent project is the <br />Oso Parkway Bridge Replacement Project in Aliso Viejo. The <br />OSHA 10-Hour <br />project consists of the removal, relocation and adjustment of <br />(Construction) <br />existing improvements, excavation and grading, removal and <br />Confined Space Entry <br />relocation of existing utilities, construction of new storm drainage <br />Years of Experience <br />and storm water pre-treatment and storage system, construction <br />of curb, gutter and pedestrian walkways and ramps, bridge <br />19 years total <br />construction, roadway paving and new overhead signage and <br />4 years with Kleinfelder <br />traffic control devices. Services include concrete batch plant <br />inspections, PCC aggregate sampling and testing, onsite flexural <br />beam fabrication, and laboratory testing. <br />City of Long Beach, On -Call Materials Testing and Inspection <br />Services, Long Beach, CA. Materials Tester. Performs soils, <br />concrete, and AC inspection and testing per Caltrans standards <br />and test methods for various street improvements. The work <br />consists of pavement reconstruction and overlays, constructing <br />PCC curbs, gutters, driveways, curb ramps, and sidewalks. <br />�/NFELOER <br />MW21011+0ciP Juan Le Roy 11 �- <br />