Laserfiche WebLink
Reporting Test Results <br />♦ When aggregate sample is taken in the material source, the testing firm shall submit to the <br />Resident Engineer results of sand equivalent, cleanness value and sieve analysis within 24 <br />hours. When soils and aggregate samples are taken at the job site, results of these tests should <br />be submitted within 72 hours. <br />♦ Results of compaction and density tests taken at the job site should be submitted within 24 <br />hours. <br />♦ When samples of soils and asphalt concrete are taken at the job site, R-value and result of <br />asphalt extraction test should be submitted within 96 hours. <br />Independent Assurance Sampling —and Testing <br />The selected firm shall establish and maintain an Independent Sampling and Testing (ISAT) program: <br />♦ To verify that the project sampling and testing are performed correctly by the testers and <br />samplers. <br />♦ To ensure the equipment is properly calibrated. <br />♦ To provide the City with a copy of the program to ensure that the program is carried out. <br />♦ To provide the Resident Engineer with a report indicating actions to be taken by the <br />selected testing firm when discrepancies are found between ISAT and acceptance tests <br />(AT). <br />C. CITY RESPONSIBILITIES <br />♦ Furnish construction plans and specifications to the consultant. <br />♦ Coordinate with the contractor regarding work schedule and notify the consultant 24 hours <br />in advance for the required inspections and tests. <br />D. SPECIAL REQUIREMENTS (ATTACHMENT 4) <br />♦ This project may utilize California Department of Transportation (Caltrans) funds and shall <br />therefore comply with all state and federal requirements. The below referenced forms <br />included in Attachment 4 (Additional Provisions) of the Appendix must be completed in <br />their entirety and submitted with your proposal: <br />LAPM Exhibit 10-H: Sample Cost Proposal <br />City of ana Ana RFP 20-111 <br />Page Al-4 <br />