My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AESCO INC.
Clerk
>
Contracts / Agreements
>
A
>
AESCO INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:57:29 AM
Creation date
7/16/2021 11:55:10 AM
Metadata
Fields
Template:
Contracts
Company Name
AESCO INC.
Contract #
A-2021-121-01
Agency
Public Works
Council Approval Date
7/6/2021
Expiration Date
7/5/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reporting Test Results <br />♦ When aggregate sample is taken in the material source, the testing firm shall submit to the <br />Resident Engineer results of sand equivalent, cleanness value and sieve analysis within 24 <br />hours. When soils and aggregate samples are taken at the job site, results of these tests should <br />be submitted within 72 hours. <br />♦ Results of compaction and density tests taken at the job site should be submitted within 24 <br />hours. <br />♦ When samples of soils and asphalt concrete are taken at the job site, R-value and result of <br />asphalt extraction test should be submitted within 96 hours. <br />Independent Assurance Sampling —and Testing <br />The selected firm shall establish and maintain an Independent Sampling and Testing (ISAT) program: <br />♦ To verify that the project sampling and testing are performed correctly by the testers and <br />samplers. <br />♦ To ensure the equipment is properly calibrated. <br />♦ To provide the City with a copy of the program to ensure that the program is carried out. <br />♦ To provide the Resident Engineer with a report indicating actions to be taken by the <br />selected testing firm when discrepancies are found between ISAT and acceptance tests <br />(AT). <br />C. CITY RESPONSIBILITIES <br />♦ Furnish construction plans and specifications to the consultant. <br />♦ Coordinate with the contractor regarding work schedule and notify the consultant 24 hours <br />in advance for the required inspections and tests. <br />D. SPECIAL REQUIREMENTS (ATTACHMENT 4) <br />♦ This project may utilize California Department of Transportation (Caltrans) funds and shall <br />therefore comply with all state and federal requirements. The below referenced forms <br />included in Attachment 4 (Additional Provisions) of the Appendix must be completed in <br />their entirety and submitted with your proposal: <br />LAPM Exhibit 10-H: Sample Cost Proposal <br />City of ana Ana RFP 20-111 <br />Page Al-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.