Laserfiche WebLink
AESCO Proposal No. P6513 <br />Statement of Qualifications <br />Main Street, Talbert Street and Heil Street Pavement <br />Rehabilitation I Huntington Beach, CA <br />AESCO performed the construction materials testing and inspections for rehabilitation of the, <br />pavement on Main Street (between Garfield Avenue and Delaware Street), Talbert Avenue <br />(between Gothard Street and Newland Street) and Heil Avenue (between Edwards Street and <br />Goldenwest Street), including reconstruction of curb and gutters, sidewalks and retaining <br />wall improvements and asphalt paving removal and replacement. Testing and inspections <br />included excavation bottoms, placement of all structural fill, concrete, rebar, crushed <br />miscellaneous base, asphalt paving including base and surface layers. <br />Project Highlights: <br />. Construction Inspection and Testing for <br />pavement rehabilitation <br />. Plan review <br />. Concrete and Asphalt Mix Design Review <br />.Inspection and Testing for soils, asphalt, base, <br />rebar, concrete <br />Start Date: September 2016 <br />Completion Date: December 2016 <br />Total Cost: $2.7M <br />Client: City of Huntington Beach <br />Role: QC Inspection and Testing <br />Key Personnel Involved: Adam Chaman, P.E., G.E., Omar Chamaa, David Ryan, RE <br />Reference <br />Joe Dale, Senior Contract Administrator I City of Huntington Beach <br />2000 Main Street, Huntington Beach, CA 92648 1 Phone: (714) 536-5431, <br />E-mail: AAka surfcitV hb or, <br />Construction Material Testing/ Inspection <br />Environmental and Geotechnical Engineering Services 16I P a g n ga t e d e a g ! ore e x t a a <br />www.AescoTech.com '7 x a m % d e Cf x o a a d vp <br />