Laserfiche WebLink
AESCO Proposal No, P6513 <br />Statement of Quabfications <br />Projects that AESCO has worked on within and/or for the City of Santa Ana <br />AESCO has held the on -call contract for materials testing and inspections and geotechnical <br />and environmental engineering for the City of Santa Ana for the past 9 years. <br />Santa Clara Sewer and Water Improvements <br />Diamond Park Mutual Water Company Water Main Improvements <br />First Street Bridge Replacement Project <br />Parton Street Sewer Main Improvements Parton & Washington Street <br />Westminster Sewer Replacement, Westminster Avenue East of Harbor Boulevard <br />17th Street Water Main Installation on Broadway and Bristol <br />Walnut Pump Station Building Upgrade <br />Lincoln Avenue and Santa Clara Flood Channel Emergency Project <br />First Street Undercrossing Stormwater Lift Station 1200 block of First Street <br />Utility Backfill for Multi -Streets in City of Santa Ana <br />Cenminela Yard Fire Rescue Pad 3401 Castor Street <br />3rd and Birch Street Parking Structure <br />Warner & Susan Industrial Asphalt 16-6868 Plant RJ Noble III B 3 Orange Plant <br />MS Megt Landscape Architecture, Center Street Urban Greening <br />Fairview Maintenance Fairview and Segrestrom <br />Parking Garage N. Spurgeon & 5th Street <br />Paving Susan and South of McFadden <br />Santa Ana Septic to Sewer Conversion Project <br />Euclid Pavement Rehab <br />San Lorenzo Sewage Lift Station Baker and Segestrom <br />Civic Center Pavilion Plaza <br />Pavement Condition Evaluation Shelton Street and West Wilshire Avenue <br />OCTA Kitchen Project at the Santa Ana Bus Base 4301 McArthur Boulevard <br />City Wide Residential Street Repair - Phase 15 Corner of MacArthur and Ramona <br />Residential Street Repair Phase 16 & Santiago Park Roadway Improvement <br />Edna Park 2140 W. Edna Dr, Santa Ana <br />Broadway between McFadden & First Curb and Gutter <br />Lyon Street Rehabilitation Chestnut Ave to First Street and Main -First intersection <br />MacArthur Blvd. Rehabilitation - Bristol to Flower <br />McFadden Rehabilitation, New Hope -Euclid <br />Flower St. Bike Trail Gap Closure, MacArthur to Sunflower <br />Phase 17 - Residential Street Repair, Lacy Street <br />Local Street Slurry Seal 2013-2014 <br />Santa Ana Zoo 1901 E. Chestnut Avenue <br />Asphalt Coring Intersection Vance & Garfield <br />Local Street Slurry Seal 2012-2013 <br />Grand Widening from 1 st to 4th Street <br />Ma le 13n T 41 S f <br />p ce rat a ety Enhancements at Occidental Street, Saint Andrew Place, and Saint Gertude <br />Place <br />Traffic Signal Installation at Raitt and Adams Street <br />Class H Bike Lane on First Street <br />Class II Bike Lane on Newhope Street <br />Pico -Lowell Residential Street Repair <br />Civic Center Drive Paving <br />Construction Material Testing/ Inspection <br />Environmental and Geotechnical Engineering Services 181 13 a g o S u e e d e rc 9 '4m e z e a a <br />www,AescoTech.com 7,4o- %de gaaund fet <br />