My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-07-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
FULL AGENDA PACKET_2021-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 10:47:42 AM
Creation date
7/19/2021 10:01:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/20/2021
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 3. PRIORITIZATION <br />A. All locations that meet the Speed Hump Warrant and petition requirements are <br />prioritized by a point system based on the following: <br />Criteria <br />Basis For Assignment <br />Max. Points <br />Severity of speeding <br />5 points for every one mph (85% tile) over <br />50 <br />34m h <br />Total daily traffic volume <br />For streets with traffic volumes greater than <br />35 <br />or equal to 500 vehicles per day, 1 point for <br />every 100 vehicles <br />Speed related accidents <br />5 points forspeed related accidents <br />5 <br />Proximity to School or Park <br />250 feet or less of a school or a park <br />10 <br />Between 251 and 500 feet of a school or a <br />7 <br />park <br />Between 501 and 600 feet of a school or a <br />3 <br />park <br />Total <br />100 points <br />B. City determines the number of speed hump locations that can be installed using <br />available budgeted funds. Installation location and funding will be evaluated at <br />least once per year, but more frequently if funding allows. <br />C. Locations on the priority, list will remain active for a period of 36 months, and a <br />new request for speed humps for the same location may not be made until the <br />location is off the list. <br />STEP 4. PERFORM ADVISORY POLL IF THERE IS SUFFICIENT FUNDING <br />For those priority locations where there is sufficient funding to allow installation, the <br />City will determine the surrounding area likely affected by the speed humps. This <br />Area of Impact is used for advisory polling purposes. Residents in the Area of Impact <br />will typically have 30 days to respond. <br />• The City presents the Area of Impact, speed hump plan and advisory polling <br />process to residents in the Area of Impact. <br />• Those residents are then polled by mail. City staff will tally the advisory poll <br />results. 66% support should be obtained for the permanent installation of speed <br />humps. if support from the Area of Impact for speed humps is not achieved, <br />residents can request speed humps again after 24 months from the date of poll <br />recommendation. <br />STEP 5. PERMANENT SPEED HUMP INSTALLATION <br />City installs speed hump at locations based on the priority list and as funding allows. <br />Design is in accordance with current speed hump standard (Attachment Q. <br />Update 5Council 5-4 7/20/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.