Laserfiche WebLink
• Requisitioned new supplies and equipment. <br />• Repaired and tested fire hydrants. <br />• Consistently assumed additional responsibilities and worked extended hours to meet project <br />deadlines. <br />• Monitored inventory and reported items to be restocked for each job. <br />• Cleared drains and downspouts and cleaned gutters. <br />t.. •: `: Superintendent <br />Miromontes Construction, Inc. — La Puente, C4 <br />Supervised a crew of 6 workers <br />All emergency work for City Los Angeles <br />Accurately estimated time and materials costs for projects. <br />• Dug trenches, backfilled holes and compacted earth to prepare for new construction. <br />• Provided accurate measurements and estimates for all projects. <br />• Repaired and tested fire hydrants. <br />• Consistently assumed additional responsibilities and worked extended hours to meet project <br />deadlines. <br />• Cleared drains and downspouts and cleaned gutters. <br />• Prepared and cleaned construction sites by removing debris. <br />• Operated equipment such as Excavators, Backhoes, skip steer loaders, Rollers, Etc. <br />02/1098 to 0^1200i Superintendent <br />I.F.T. Construction — Murrieta, C4 <br />• Completed tear -down of existing structures and prepared for new construction. <br />• Accurately estimated time and materials costs for projects. <br />• Dug trenches, backfilled holes and compacted earth to prepare for new construction. <br />• Repaired and tested fire hydrants. <br />• Consistently assumed additional responsibilities and worked extended hours to meet project <br />deadlines. <br />• Prepared and cleaned construction sites by removing debris. <br />• Operated equipment such as Excavator, backhoes, skip steer loaders, Etc. <br />• Supervised 2 underground crews 8 workers and iconcrete structure crew of 4 workers. <br />• scheduling of material work for all public works projects <br />• worked in sewer main, storm drain, and water main projects $200,000-$7,000,000 <br />nai Iu$U to oi/ tgga Foreman, Operator, Pipelayer <br />Calton Construction Inc. — Rialto, Gt <br />• Completed tear -down of existing structures and prepared for new construction. <br />• Accurately estimated time and materials costs for projects. <br />• Dug trenches, backfilled holes and compacted earth to prepare for new construction. <br />• Repaired and tested fire hydrants. <br />• Consistently assumed additional responsibilities and worked extended hours to meet project <br />deadlines. <br />• Prepared and cleaned construction sites by removing debris. <br />• Operated equipment such as Excavator, backhoes, skip steer loaders, Etc. <br />• Run crew of 8 workers <br />EDUCATION <br />GED: <br />BeliHigh School - Bell, C4 <br />• Coursework in Materials and Tools Used in the Trade <br />• Coursework in Reading Plans and Site layout <br />• Course in General Engineering <br />&nbsp; <br />City Council <br />&nbsp;13 &ndash;&nbsp;134 <br />7/20/2021 <br />&nbsp; <br />