My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-07-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
FULL AGENDA PACKET_2021-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 10:47:42 AM
Creation date
7/19/2021 10:01:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/20/2021
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE WARNER PRCLECT <br />WATER SUPPLY AsSESSMENT AUGUST 21 , 2020 <br />overdraft. DWR has one year to evaluate the Basin 8-1 Alterative. The paragraphs below will <br />further explain how OCWD successfully manages the OC Basin to meet these new groundwater <br />monitoring and management requirements. <br />OCWD manages the Basin through the Basin Production Percentage (BPP) which is determined <br />each water year. The BPP is set based on groundwater conditions, availability of imported water <br />supplies, water year precipitation, SAR runoff, and basin management objectives. The BPP <br />represents an established percentage identifying the amount of groundwater all pumpers in the <br />Basin can pump without paying a "pumping tax' or Basin Equity Assessment (BEA) to OCWD. <br />For example, if the BPP is set to 75%, all pumpers within the Basin, including the City, can supply <br />75% of their water needs from groundwater supplies at a cost significantly less than the cost of <br />imported water. If groundwater production is equal to or less than the BPP (i.e. less than 75% <br />in the example above), all producers within the Basin pay a replenishment assessment (RA fee <br />which is used to fund groundwater replenishment and recharge programs aimed at ensuring <br />the long-term viability and stability of the Basin. If groundwater production is greater than the <br />established BPP for that water year (i.e. greater than 75% in the example above), the BEA is <br />determined for the producer of that amount of groundwater provided in excess of the BPP. The <br />BEA is an additional fee paid on each AF of water pumped above the BPP, making the total <br />cost of that additional water equal to the higher cost of imported water from Metropolitan. <br />According to OCWD's Engineer's Report for fiscal year 2017118, total water demands within <br />the OCWD jurisdiction were 419,477 AF for the 201 7-18 water year. Groundwater production <br />totaled 310,025 AF with supplemental water totaling 227,413 AF. As shown in Table 6 below, <br />the City utilized 35,054.1 AF of water in the 201 7-18 water year. <br />Table 6 City of Santa Ana Groundwater Production Data 2015-I6 <br />Groundwater <br />Supplemental Water (AF) <br />(AF) <br />Actual BPP <br />Groundwater <br />Producer <br />Total <br />Deliveries Conservation Total <br />Grand <br />Non -Irrigation <br />Credit <br />Total <br />Only <br />City of Santa <br />Ana <br />25,705.3 <br />9,265.4 <br />83.4 <br />9,348.8 <br />35,054.1 <br />73.3% <br />Source: OCWD 2017-18 Engineer's Report <br />Over the recent past, production capability of the Basin has increased as a result of increased <br />wastewater reclamation at the Groundwater Replenishment System (GWRS) located in Fountain <br />Valley. The GWRS, which is designed to turn wastewater into drinking water, is one of the most <br />technologically advanced wastewater treatment plants in the world. Atreatment plant expansion <br />of 30 million gallons per day was recently put on line by OCWD increasing the recharge <br />capacity of the GWRS to 100 million gallons per day. This equates to the recycling of over <br />1 10,000 AFY of wastewater back into the Basin for future extraction and potable use. A final <br />expansion of the treatment system is being designed to have a capacity of 130 million gallons <br />per day. Expansion projects to the GWRS increase local water supply reliability and ensure low- <br />cost water supplies throughout northern Orange County, including the City of Santa Ana. <br />Fus OE ENGINEERING, INC. 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.