Laserfiche WebLink
THE WARNER PRCLECT <br />WATER SUPPLY ASSESSMENT AUGUST 21 , 2020 <br />As shown in Table 9 above, in all climate scenarios analyzed in the 2015 UWMP, available <br />water supplies are projected to meet demands. Reliability of local water supplies will be ensured <br />through continued implementation of the OCWD Groundwater Management Plan, OCWD's <br />LTFP, and the combined efforts and programs among member agencies of Metropolitan. <br />The City closely monitors development throughout the City to ensure water supplies will meet <br />growing demand. The City has a log of all developments that have required a WSA and track <br />the increases in water demands from these projects. These projects are listed below: <br />• Civic Center Facilities Project WSA (November 2016) <br />Elan Apartments Project WSA (November 201 7) <br />• MainPlace Mall Project WSA (April 201 9) <br />• 4`h and Cabrillo Project WSA (August 2020) <br />The Warner Project has been added to the City's list of proposed developments. The Project is <br />anticipated to be constructed and operational in 2023. As shown in Table 10 below, the City <br />is able to provide water supply to satisfy these additional projects including the Warner Project. <br />Fus OE ENGINEERING, INC. 24 <br />