My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-07-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
FULL AGENDA PACKET_2021-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 10:47:42 AM
Creation date
7/19/2021 10:01:23 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/20/2021
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rainbow Crosswalks in Downtown Santa Ana <br />July 20, 2021 <br />Page 6 <br />• The $8,000 cost estimate includes a durable application material that lasts longer <br />than traditional paint. <br />• Staff has identified the crosswalks on Broadway at 2nd Street as a possible <br />location to install rainbow crosswalks. <br />• The design would need to comply with the California Manual on Uniform Traffic <br />Control Devices (CA MUTCD) requirements, which, among other specifications, <br />require that the white outer lines remain. <br />• The installation is expected to last three to five years, with a yearly maintenance <br />cost estimate of $1,500. <br />Next Steps <br />At this time, staff requests direction from the City Council relating to a proposal to install <br />rainbow crosswalks in Downtown Santa Ana. <br />FISCAL IMPACT <br />There is no fiscal impact associated with this action. <br />Submitted By: Kristine Ridge, City Manager <br />Approved By: Kristine Ridge, City Manager <br />City Council 28 — 6 7/20/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.