My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHAMBERS GROUP, INC. (4)
Clerk
>
Contracts / Agreements
>
C
>
CHAMBERS GROUP, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 4:16:52 PM
Creation date
7/19/2021 3:58:14 PM
Metadata
Fields
Template:
Contracts
Company Name
CHAMBERS GROUP, INC.
Contract #
A-2021-110-02
Agency
Community Development
Council Approval Date
7/6/2021
Expiration Date
7/31/2022
Insurance Exp Date
5/12/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP #21-017: On -Call Environmental Review Services for the <br />Housing Division <br />City of Santa Ana Community Development Agency <br />CHAMBERS <br />GROUP <br />Project Homekey Due Diligence Studies, Los Angeles County Department of Public Works, Various locations in Los <br />Angeles County, CA: Project Homekey is the State of California's response to protecting California's homeless, who are <br />at high risk for serious illness and are impacted by the COVID-19 pandemic. Administered by the California Department <br />of Housing and Community Development, $600 million in grant funding was made available to local public entities, <br />including cities, counties, or other local public entities, to purchase and rehabilitate housing, including existing hotels, <br />motels, vacant apartment buildings, and other buildings and convert them into interim or permanent, long-term <br />housing. Of the $600 million in Homekey grant funds, $550 million was derived from the state's direct allocation of the <br />federal Coronavirus Aid Relief Funds, and $50 million was derived from the state's General Fund. Converse Consultants <br />performed Preliminary Reviews, Phase I ESAs, Geologic Hazards Analysis, and Probable Maximum Loss Assessments <br />(PMLAs) for various sites located in Los Angeles County. <br />LLG - Transportation Planning and Traffic Engineering Consultation Services <br />LLG would provide transportation planning and traffic engineering consultation services as needed for the City. LLG is <br />a well -respected, medium sized firm, comprised of dedicated professionals who serve their clients on a wide variety of <br />traffic and transportation issues. LLG Principals and Senior Staff are recognized experts in these practice areas and <br />possess professional registrations in Traffic Engineering, Civil Engineering, or both. LLG's diverse experience and <br />expertise enable them to provide services to both public agencies and the private sector. <br />LLG's specialties include: <br />Traffic Studies for Environ. Documents <br />Traffic Planning, Operations, & Simulation Studies <br />Traffic Signal Warrant Studies <br />Traffic Impact Studies <br />Circulation Elements for General Plans & Specific Plans <br />Construction Zone Traffic Control Plans <br />SB 743/VMT Analyses <br />Preliminary/Conceptual Engineering <br />Shared Parking Demand Forecasting <br />Site Access and Circulation <br />Traffic Signal Design <br />Parking Design and Planning <br />Multimodal Analysis <br />Traffic Signing and Striping Design <br />Complete Streets Consultation <br />Sample LLG Project Experience includes: <br />4th & Mortimer, Santa Ana, CA: LLG prepared a traffic impact analysis report for the 4th & Mortimer Project. The <br />Project included the development of 169 apartment units and 11,361 SF of retail/commercial floor area. The traffic <br />study evaluated the proposed Project's near -term and long-term traffic impacts at six key study intersections and also <br />included analysis for site access. A VMT screening assessment was also competed to evaluate the Project based on <br />SB743 requirements consistent with OPR and the City of Santa Ana CECL4 VMT Analysis guidelines. <br />First American Plaza 4th and Main Apartments, Santa Ana, CA: LLG prepared a traffic impact analysis report for the <br />First American Plaza —4th + Main Project. The Project included the development of 220 DU apartment units and 12,350 <br />SF of retail/commercial floor area. The traffic study evaluated the proposed Project's near -term and long-term traffic <br />impacts at nine key study intersections and also included analysis for site access and internal circulation. <br />First Street Family Apartments, Santa Ana, CA: LLG prepared a traffic impact analysis report for the First Street Family <br />Apartments Project, which consists of a 69-unit apartment complex located at 1440 East First Street in the City of Santa <br />Ana, California. The traffic study evaluated the proposed Project's near -term and long-term traffic impacts at four key <br />study intersections and also included analysis for site access and internal circulation, including a project gate stacking <br />analysis. <br />G. References <br />Being as the RFP detailed the Reference Form is not counted as part of the maximum page count, this information is <br />included in Appendix A. <br />H. Fee Schedule <br />General fee schedules for environmental and planning services and technical studies follow in Appendix A. Being as the <br />RFP detailed the fee schedule is not counted as part of the maximum page count, this information is included in <br />Appendix A. <br />24 <br />Est <br />1979 <br />www.chambefsgioupinc com <br />
The URL can be used to link to this page
Your browser does not support the video tag.