My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RMF CONTRACTING, INC. DBA R&M ELECTRICAL CONTRACTING
Clerk
>
Contracts / Agreements
>
PROJECTS
>
RMF CONTRACTING, INC. DBA R&M ELECTRICAL CONTRACTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 10:53:48 AM
Creation date
7/27/2021 3:14:38 PM
Metadata
Fields
Template:
Contracts
Company Name
RMF CONTRACTING, INC. DBA R&M ELECTRICAL CONTRACTING
Contract #
P 20-2714 & 20-271
Agency
Public Works
Council Approval Date
7/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />0 <br />c-a <br />8 <br />cD <br />O <br />CITY" 4F SANTA ,AN,A <br />PUBLIC WORKS AGENCY <br />M ` CONTRACT CHANGE ORDER <br />Project Number 20-2714 — El Salvador Park Basketball Court and -Court.Ughting Change Order 1 <br />u 20-2717�_Vvbrvtew Park Ballfield Sports Lighttng Renovation Number To, R&M Electrical Contractin ____� — Contractor <br />Yen are hereby directed to make the hareln ohabges from the plans and specifications or do the following dosorlbod work riot Included In the plans and <br />speclgoallons on We contrast. <br />IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OROITY <br />Unless oihatwisastated, rates for rental of equipment cover only such time as equipment Is actually used and no allowance will be made for idle time. <br />ChANO requestod py PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED UNIT PRICE <br />Increased scope of work with quantity and unit price are shown as following table (PCO#1, 02 & #3): <br />20.2714 _ El Salvador Park B6s_ketball Court and Court Ughting (Po0#1) <br />Item <br /># <br />Description <br />Estimated <br />uantit <br />Unit <br />Unit Price <br />Amount <br />15 <br />Additional Musco Poles (2) & Fixtures (4) — Provide all material, equipment and labor to <br />install 2h additional Musco poles and (4) fixtures, <br />Labor— Electrical foreman w/ 20% markup <br />8. <br />HR <br />1,11,70 <br />894.24 <br />— <br />Labor— Electrical apprentice w120%markup <br />— ' 8 <br />HR <br />75.61 <br />600.08 <br />Labor— Operating engineer w/ 20% markup <br />8 <br />HR <br />122.67 <br />981.36 <br />Labor — Journeyman labrer w! 20%mark up <br />8 <br />_�.__... <br />HR <br />._._____... <br />96.._,...76._ <br />___ <br />.,_774.08 <br />Material — (2) Musco poles & (4) fixtures w/ <br />15% markup <br />1 <br />EA <br />23,970.60 <br />23,970.60 <br />Material — Concrete w/.16% markup <br />5 <br />YID <br />180.76 <br />948.75 <br />Equipment — Crane rental w/ 15% markup <br />3 <br />HR <br />224.25 <br />672.75 <br />Equipment — Forklift rental w/ 15% markup <br />1 <br />EA <br />576.0C <br />575.00 <br />Bond Q 1.5% <br />1 <br />EA <br />441.25 <br />441.25 <br />ESTIMATED SUB -TOTAL <br />1 $29,858.11 <br />A <br />16 <br />Handball Court Lighting — Replace 1 fixture on.each hand ball court (total of 2) ; <br />Labor— Foreman electrician w/ 20% markup <br />6 <br />HR <br />119.41 <br />716.46 <br />Labor— Electrical apprentice w120%markup <br />6 <br />HR <br />75.01 <br />450.06 <br />Material — Musco fixtures w/ 15% markup <br />1 <br />EA <br />7,085.00 <br />7,086.00 <br />Equipment — Lift rental w 15% markup <br />1 <br />EA <br />750.00 <br />750.00 <br />Equipment — Work truck 1-ton w/ 15% <br />markup_ <br />6 <br />HR <br />32.73 <br />198.38 <br />Bond @ 1% <br />1 <br />EA <br />91.98 <br />91.98 <br />ESTIMATED SUB -TOTAL <br />$9,289.88 <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.