My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W.A. RASIC CONSTRUCTION COMPANY, INC.
Clerk
>
Contracts / Agreements
>
W
>
W.A. RASIC CONSTRUCTION COMPANY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2021 10:46:52 AM
Creation date
8/17/2021 10:06:57 AM
Metadata
Fields
Template:
Contracts
Company Name
W.A. RASIC CONSTRUCTION COMPANY, INC.
Contract #
A-2021-132-01
Agency
Public Works
Council Approval Date
7/20/2021
Expiration Date
7/19/2024
Insurance Exp Date
5/1/2022
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f Santa Ana•; <br />Works Agency <br />1 036 ='Sewer System Repair Services A' <br />RELEVANT CONSTRUCTION PROJECTS COMPLETED <br />Project #1: <br />Project Name: CSUSB Infrastructure Upgrades- Housing & Campus Phase 1 & 4 <br />Location: San Bernardino, CA <br />Owner: Trustees of the California State University <br />g <br />Owner Contact (name and current phone number): <br />Chris Myers, Project Manager (949) 648-3466 <br />Architect or Engineer: <br />F <br />P2S Engineering, Inc. <br />Architect or Engineer Contact (name and current phone number): <br />Charlotte Dean (562) 497-2999 <br />Construction Manager Contact (name and current phone number): <br />Chris Myers, Project Manager (909) 648-3466 <br />Description of Proiect, Scope of Work Performed: <br />Perform upgrades of all underground utilities throughout campus. The project included <br />furnishing and installing new hot and chilled water hydronic piping, underground piping <br />vault sewer, storm drain, and water utilities. <br />e <br />Total Value of Construction (including change orders): $7,910,100 <br />1 <br />Original Scheduled Completion Date: August 2018 <br />zero days <br />Actual Date of Completion: August 2018 <br />lY.X.RASI1 tUl <br />
The URL can be used to link to this page
Your browser does not support the video tag.