Laserfiche WebLink
W,A, RA5IC CONSTRUCTIOIII <br />COST PLUS RATES EFFECTIVE JULY 1, 2020 through JUNE 30, 2021 <br />CRAFT <br />STRAIGHT <br />OVER <br />DOUBLE <br />CRAFTSMAN/CLASS <br />CODE <br />TIME <br />TIME <br />TIME <br />CARPENTERS <br />General Foreman <br />CAGF <br />105.02 <br />141.40 <br />177.78 <br />Foreman <br />CAFM <br />101.83 <br />136.70 <br />171.58 <br />Journeyman <br />CALM <br />97.05 <br />129.66 <br />162.28 <br />Apprentice -8th Period(90%) <br />CAA8 <br />90.30 <br />119.50 <br />148.85 <br />CEMENTMASONS <br />Foreman <br />CMFM <br />97.78 <br />127.61 <br />157.71 <br />Journeyman Commercial <br />CMJC <br />93.27 <br />120.57 <br />148.42 <br />Journeyman Light Commercial <br />CMJL <br />84.60 <br />109.77 <br />135.21 <br />F&T Machine Operator <br />CMFT <br />93.64 <br />121.15 <br />149.19 <br />Apprentice - 81h 6 Mos. (90%) <br />CMA8 <br />87.47 <br />112.00 <br />136.95 <br />LABORERS <br />General Foreman <br />LAGF <br />95.09 <br />125.51 <br />156,48 <br />Foreman <br />LAFM <br />93.21 <br />122.58 <br />152,61 <br />Group 1 -Geneml <br />LAG1 <br />86.21 <br />111.98 <br />138,19 <br />Group 2-Chute Man <br />LAG2 <br />87.04 <br />113,20 <br />139.90 <br />Group 3- Pipeline Backup Man <br />LAG3 <br />87,86 <br />114,42 <br />141.60 <br />Group 4-Pipe Layer, C&S <br />LAG4 <br />90,20 <br />117,89 <br />146.41 <br />Group 5-Blaster l Driller <br />LAG5 <br />90.72 <br />118.71 <br />147.49 <br />Apprentice -6th Period(85%) <br />LAAB <br />68.69 <br />92.38 <br />116.63 <br />OPERATING ENGINEERS <br />General Foreman, Appdx. A <br />OEGF <br />122.29 <br />163.64 <br />205.00 <br />Foreman, Appdx. A <br />OEFM <br />119.14 <br />158.95 <br />198.80 <br />Group 1, Appdx, A - Oiler <br />OEG1 <br />111.78 <br />147.47 <br />183.64 <br />Group 2, Appdx. A - Oiler <br />OEG2 <br />112.96 <br />149.30 <br />186.06 <br />Group 8, Appdx. A - Universal <br />OEG8 <br />116.13 <br />154.26 <br />191 <br />Group 10, Appdx. A- Mechanic <br />OEGM <br />116.31 <br />154.54 <br />192.97 <br />Group 8, Appdx. B- Crane (up to 25 tons) <br />OEB8 <br />116.57 <br />154.94 <br />193.50 <br />Group 9, Appdx. B - Crane (26 to 50 tons) <br />OEB9 <br />116.82 <br />155.34 <br />194.02 <br />Apprentice, GR 8, Appdx A - 6th (90%) <br />OEA6 <br />108.28 <br />142.30 <br />176.81 <br />Southern California <br />Cost Plus Rates <br />CRAFT <br />STRAIGHT <br />OVER <br />DOUBLE <br />CRAFTSMAN/CLASS <br />CODE <br />TIME <br />TIME <br />TIME <br />PROJECT MANAGEMENT <br />Project Administrator <br />PADM <br />67.72 <br />87.09 <br />106.46 <br />Project Engineer 1 <br />PEGI <br />73.99 <br />96.09 <br />118.20 <br />Project <br />Engineer 2 <br />PEG2 <br />93.89 <br />125,91 <br />158.21 <br />Project <br />Engineer 3 <br />PEG3 <br />96.60 <br />128,67 <br />160.74 <br />Project Engineer 4 <br />PEG4 <br />107.87 <br />146,14 <br />154.69 <br />Superintendent <br />PMSP <br />147.56 <br />192,38 <br />237.20 <br />Assistant Project Manager <br />PMAS <br />121.88 <br />16670 <br />212.00 <br />Project Manager <br />PMPM <br />137.81 <br />185,87 <br />233.93 <br />Senior Project Manager <br />PMSR <br />197.35 <br />266.08 <br />334.80 <br />TEAMSTERS <br />Foreman <br />TDFM <br />93.59 <br />118.81 <br />144.69 <br />GR 1 -Warehouseman <br />TDG1 <br />89.03 <br />112.08 <br />135.41 <br />GR 2 - 2 Axle Vehicle <br />TDG2 <br />89.25 <br />112.41 <br />135.85 <br />GR3-3 Axle Vehicle/2 Axle Water Truck <br />TDG3 <br />89.45 <br />112.70 <br />136.23 <br />GR 4 - Transit Mix Track, 3 CUYD <br />TDG4 <br />89.73 <br />113.12 <br />136.79 <br />GR5- 3 Axle or more Water Truck <br />TDG5 <br />89.78 <br />113.19 <br />136.87 <br />GR 6 - Dump Track 16 to 25 CUYD <br />TDG6 <br />89.82 <br />113.25 <br />136.96 <br />GR 7 - Forklift Driver <br />TDG7 <br />90.20 <br />113.81 <br />137.70 <br />GR 8 - Dump Truck 25 to 49 CUYD <br />TDG8 <br />90.58 <br />114.36 <br />138.43 <br />GR9-Low Bed Driver-9 Axles or over <br />TDG9 <br />90.88 <br />114.81 <br />139.02 <br />GR10- Working Truck Driver <br />TDG10 <br />91.33 <br />115.47 <br />139.94 <br />GR11 - Boom Truck It 7K and Below) <br />TDG11 <br />92.08 <br />116.59 <br />141.49 <br />GR12- Boom Truck (I 7K and Above) <br />TDG12 <br />92.73 <br />117.54 <br />142.83 <br />Apprentice -Gib Period(95%) <br />TDA6 <br />75.01 <br />97.94 <br />121.23 <br />WELDERS/FITTERS/HLP-Local 250 Shorti <br />Foreman <br />WLFM <br />124.41 <br />170.00 <br />212.86 <br />Journeyman <br />WLJM <br />117.43 <br />1%55 <br />199.30 <br />Metal Trades <br />WLMT <br />71.52 <br />93.11 <br />113.90 <br />Apprentice Rates: Apprentice rates listed above are for the highest classification prior to journeyman full scale rates. Billing for apprentices will be based on actual classificaticn(s) <br />noticed. <br />Boundaries of Southern California Cost Plus Rates: Consist of the eleven (11) counties of Los Angeles, Inyo, Mono, Orange, Riverside, San Bernardino, Imperial, Ventura, <br />Santa Barbara, San Luis Obispo, Kern and In addition: Richardson Rock, Santa Cruz Island, Arch Rock, San Nicholas Island, Catalina Island, San Clemente Island, San Miguel <br />Island, Santa Barbara Island, Santa Rosa Island, Anacapa Island, Including the Channel Islands Monument. Rate Scale does not Include San Diego County. <br />Markup: Material, subcontractors, subsistence, outside rentals (including fuel costs) etc., will be billed cast, plus sales tax as applicable, plus mark-up of 15%. <br />Overtime Rates: Shil shall be paid per union agreement(s). <br />Subsistence: Lodging & meals for management, superintendents & general foremen will be billed at actual costs, plus mark-up at 15% <br />Travel Time: Billing time will start once employees are dispatched and and upon their return to the company facility. <br />USA Notification: Client is responsible for Underground Service Alert (USA) notification for all emergency work. <br />NOTE: All wage scales presented herein are subject to change without notice. This document does not Include all labor classifications. Additional labor classifications are available <br />upon request. Some work areas may be subject to special wage agreements, If applicable, fees will be billed accordingly. <br />REVISED 1CI09/20 <br />4150 Long Beach Boulevard, Long Beach, CA 90807 • Phone: 562-928-6111 • Fax: 562-928-7339 • www.warasic.com <br />State Contractor's License #A368761 <br />