Laserfiche WebLink
5. Remodel Manhole Base <br />EA <br />10 <br />$ 2, 960 <br />$ 29, 600. 00 <br />(As -Needed) <br />6. Construct New Manhole Not More <br />Than 8' Deep per Standard Plan <br />1201 (As -Needed) <br />EA <br />50 <br />$26,275 <br />$1,313,750.00 <br />7. Construct New Manhole Between <br />8'-12' Deep per Standard Plan 1201 <br />(As -Needed) <br />EA <br />10 <br />$32,750 <br />$327,500.00 <br />8. Raise Existing Manhole Frame and <br />Cover, and replace collar to Grade <br />per Standard Plan 1201 <br />EA <br />30 <br />$5, 820 <br />$174, 600.00 <br />(As -Needed) <br />9. Replace Manhole Cover Concrete <br />Collar per Standard Plan 1201 <br />(As -Needed) <br />EA <br />30 <br />$2,255 <br />$ 67,650.00 <br />10. <br />Furnish and Install Traffic Loop <br />EA <br />5 <br />$1, 100 <br />$ 5, 500.00 <br />11. <br />Provide Sewer Lateral Lining with <br />EA <br />60 <br />$16, 620 <br />$ 997, 200. 00 <br />Cleanout, 4" and 6" Sewer Lateral <br />Pipe (As -Needed) <br />12. <br />Provide Top Hat Repairs, 4" and 6" <br />EA <br />40 <br />$1, 200 <br />$ 48, 000 . 00 <br />Sewer Lateral Pipe (As -Needed) <br />13. <br />Provide Pipe Bursting Repair with <br />Cleanout, 4" and 6" Sewer Lateral <br />Pipe per Standard Plan 1204A (As- <br />EA <br />25 <br />$ 17, 700 <br />$ 442 , 500 .00 <br />Needed) <br />14. <br />Provide Open Trench <br />Repair/Replacement with Cleanout, <br />4" and 6" Sewer Lateral Pipe per <br />EA <br />25 <br />$ 20, 725 <br />$518 , 125 .00 <br />Standard Plan 1204 (As -Needed) <br />RFP 21-036 Addendum One <br />May 17, 2021 <br />5of7 <br />