Laserfiche WebLink
0 <br />tluntich <br />the emergency does not warrant a lump sum proposal or the scope of work cannot be ascertained, we will then <br />proceed under the City's direction on a Time and Material basis using the agreed upon rates. We will then notify <br />the local residents and business of our start of work with an estimated completion. Access to local driveways <br />and businesses will be our top priority and maintained to the best of our ability. Traffic control or plating over <br />excavations to maintain safe access and keep community relations strong, At the end of each .day a time and <br />materials ticket Will be completed and sent Into the City for approval. In addition to this ticket e detailed work <br />plan will be provided for each following daysothat the city is aware of the progress of the work. This process <br />will continue until each project has been completed. At the completion of the work each project area will be <br />restored at a minimum to pre -working conditions or better, If requested by the City. <br />e. Relevarit Project -Experience <br />Mladen Buntich,Construction Co., Inc: possess a Class A license, and has :an extensive history of working on <br />emergency construction repair projects. MBC has been a qualified Contactor selected for the City of Los <br />Angeles' emergency on -call lists since 2007. Whereas the failure of sewers and/or storm drains can jeopardize <br />public health and safety, and whereas, certain emergency repair work beyond the capability of the City's <br />maintenance forces, the City Board has authorized MBC to perform expeditious emergency repairs, Under this <br />contract, MBC has been selected to perform work on over 200 sewer and/or storm drain repair projects ranging <br />from $1,000 to $4M. Damaged utilities have been successfully repaired by open cut, sliplining, and CIPP dining <br />methods. MBC has a proven track record of responding to such emergencies in an urgent manner while making <br />the necessary repairs to ensure public health and safety. As such, MBC has been a qualified emergency <br />contractor with the City of Los Angeles for the past five (5) year contracts; 2007,2012, 2012-2017, and currently <br />2017-2022. — See sampling of completed projects below. <br />Project Contract <br />Name of Owner Type of Work Date Amount <br />Oitmans Construction„ General Contractor <br />10005 Mission Mill Road 662 LF <br />Whittler, CA, 90601 8" $DR 35 <br />Attn,. Colin Cummins 114-552-2426 Sewer Pipeline 02/21- $101K <br />Goodman Commerce Center Los Angeles Open Out 03/21 <br />City of LA., Dept, of Public Works <br />1149 S. Broadway, Suite 700 10 LF <br />Los Angeles, CA 90015-2213 a" VCP/8"x6mm CIPP 12120 <br />Attn: Richard Reyes -Abraham 213-485-5728 Sewer Pipeline 12/21 $28K <br />ESR - Venice Blvd. (HOOD W. Block) Open Cut CIPP Lining <br />City of L.A., Dept. of Public Works <br />1149 S. Broadway, Suite 700 <br />Los Angeles, GA 90015.2213 <br />Attn. Armen Dermenj€an 213485-1682 <br />ESR- Wetherly Or, (1300 N. Block) <br />252 LF <br />8" VCP <br />Sewer Pipeline 12/20 - <br />Hydrojetting/Open Cut 01/21 <br />Page 9 of 12 <br />$56K <br />