Laserfiche WebLink
Base Labor <br />Standard Time <br />(per hour(per <br />Overtime <br />hour(per <br />Double Time <br />hour <br />Superintendent/Foreman <br />$ 90.00 <br />$ <br />122.00 <br />$ 162.00 <br />Operator <br />$ 88.00 <br />$ <br />118.00 <br />$ 168.00 <br />Pipe layer <br />$ 82.00 <br />$ <br />103.00 <br />$ 130.00 <br />Laborer <br />$ 79.00 <br />$ <br />100.00 <br />$ 125.00 <br />Driver <br />$ 74.00 <br />96.00 <br />$ 123.00 <br />Welder <br />$ - 77.00 <br />$ <br />117.00 <br />$ 137.00 <br />Mason <br />$ 75.00 <br />$ <br />"'-95.00 <br />115.00 <br />Base Equipment Owned <br />Base Equipment (Owned) <br />A/C Grinder w/ Broom <br />60 <br />Arrow board <br />- 15 <br />Blade <br />NA <br />Cement Mixer <br />10 <br />- <br />Compaction Testing- <br />-90 <br />Compactor <br />10 <br />Compressor <br />20 <br />Concrete/Asphalt Saw <br />60 <br />Concrete Finisher <br />60 <br />Dump Truck <br />40 <br />Excavator (140 - 270 Net HP) <br />90 <br />Excavator 80-125 Net HP <br />70 <br />Hydraulic Breaker Backhoe <br />100 <br />Jackhammer - <br />3 <br />Line Pull <br />5 <br />Loader Backhoe (70 -99 Net <br />HP) <br />52 <br />Loader Backhoe (100 - 129 <br />Net HP) <br />55 <br />Pneumatic Tools <br />10 <br />Power Broom <br />55 <br />Operator <br />80 <br />Saw Truck <br />130 <br />Semi -Truck <br />65 <br />Skid Steer Loader <br />30 <br />Skip Loader <br />45 <br />- <br />Street Sweeper <br />120 <br />Test Pump <br />- 5 <br />Trench Plates <br />5 <br />- <br />Tool/Service Truck <br />-- 30 <br />Vacuum Truck <br />-320 <br />Vibra Plate <br />3 <br />- <br />Whacker Walk Behind Roller <br />10 <br />Wheel Loader 2 - 3yards) <br />65 <br />Water Pump <br />20 <br />Water Truck <br />50 <br />Zi er (asphalt trencher <br />60 <br />Company Name <br />Domin uez General En Ineerin , Inc. <br />Name <br />Adolfo Dominguez <br />Title <br />President <br />Date <br />May 19, 2021 <br />1/1 <br />