Laserfiche WebLink
5. <br />Remodel Manhole Base <br />EA <br />10 $ <br />$ <br />(As -Needed) <br />6. <br />Construct New Manhole Not More <br />Than S' Deep per Standard Plan <br />1201 (As -Needed) <br />EA <br />50 $ /5 Ooy' <br />$ Tool000'-, <br />7. <br />Construct New Manhole Between <br />8'-12' Deep per Standard Plan 1201 <br />(As -Needed) <br />EA <br />10 $ p0U <br />$ 2Ct O <br />8. <br />Raise Existing Manhole Frame and <br />Cover, and replace collar to Grade <br />per Standard Plan 1201 <br />EA <br />30 $ Jai 00.. <br />$ /504 OOa- " <br />(As -Needed) <br />9. <br />Replace Manhole Cover Concrete <br />Collar per Standard Plan 1201 <br />(As -Needed) <br />EA <br />30 $ �✓ Q"' <br />$_O�OGC?r <br />10. <br />Furnish and Install Traffic Loop <br />EA <br />5 $ <br />11, <br />Provide Sewer Lateral Lining with <br />EA <br />60 $ `, <br />$ �0 000," " <br />Cleanout, 4" and 6" Sewer Lateral <br />Pipe (As -Needed) <br />12. <br />Provide Top Hat Repairs, 4" and 6" <br />EA <br />40 $ SSt 54A°"' <br />$ ; YOt 00o• ' <br />Sewer Lateral Pipe (As -Needed) <br />13. <br />Provide Pipe Bursting Repair with <br />Cleanout, 4" and 6" Sewer Lateral <br />Pipe per Standard Plan 1204A (As- <br />EA <br />25 <br />$ " <br />Needed) <br />14. <br />Provide'Cpen Trench <br />Repair/Replacement with Cleanout, <br />4" and 6" Sewer Lateral Pipe per <br />PA <br />25 $ 5 000 <br />$ 3�%5, p00 ` <br />Standard Plan 1204 (As -Needed) <br />r <br />RFP 21-036 Addendum One <br />May 17, 2021 <br />6of7 <br />