Laserfiche WebLink
Job Name: Magnolia Blvd Sanitary sewer Main Supervised By; Adolfo Dominguez <br />Owner; City ofBurbank <br />Type of Work: Sower Replacement CoutractAmomn: $182,000.00 completed 7/2006 Contact: 818-238-3955 <br />Job Name: Conhaot#3840-0 sewer <br />Owner: City of Carlsbad <br />Type Of Work: <br />Constraot 8" HDPB Sewer Pipe, 6" 1IDPE wet well, Curb and Gutter <br />Contract amount, $199,201,00 completed 10/1412005 <br />Contact: Kevin #760.602.2720 <br />Job Name: Extension of Castle Storm Drain <br />Owner: City Of La Canada Flintridge <br />Type of Work; Storm Drain installation. installation of 24", 36", 48", 51 ", RCP pipe house laterals, <br />construct concrete collars, junction sttuctures and curb and gutters, <br />Contract Amount: $314,120.00 Completed 11/2009 <br />Contact: Nasser Shouslitarian 818-790-8882 Senior Civil Engineering <br />Job Name: Bristol St, Storm Drain <br />Owner; City Of Santa Ana <br />Type Work: Storm drain installation of 50, 48", RCP Pipe <br />Contract Amount: $1,635,274.00 Completed 4/07 <br />Contact Ed Torres #714-647-5018 <br />Job Name: Tesquequite Sewer <br />Owner: City of Riverside <br />'type Work: Sewer Replacement 36" VCP —Case Bedding, manholes, sidewalk, curb and gutters, 81" <br />storm drain Removal, abandon sewer mains. <br />Contract Amount $939,668 Completed 12/04/2006 <br />Contact: Daniel Ciaccella4951-826-5236 <br />"No Claims, Liquidated damages, Mediations Arbitrations or Lawsuits" <br />All 100% constructed By Dominguez General Engineering, Inc, <br />