Contract: $3,197,670,00 Completed; 7/8/20l I
<br />Contact. Charles Gettlerfaspector310-925-0702 grJuanMartinez Civil Engineer Supervised byVfptgrponi iguez&Adolfo
<br />Dominguez
<br />Job Name: Foothill BIvd. WatorlinpPovement (Grand Ave. to Cullen Ave)
<br />Owner: City of Glendora
<br />116 R. Foothill Blvd,, Glendora, CA. 91741
<br />Type Work: install4699 If. Of16" ductile inm pipe CL350, 741f; Of 30" steel pipe casing 1K" wall thickness under railroad way, 17
<br />of16" butterfly valves, 10 6" fire hydrant assembly, V blow offs, 1"& 2"water service assemblies.
<br />Contract: $1,276,752,00
<br />Contact: Civil Bngincor Jason Rtiegluborn 626-914-8253 cell 626-374-5336 Supervised by Adolfo Donnguez
<br />Completed: 312011
<br />Job Name: Cast Iron Main Replacement —Artesia Blvd
<br />Owner; Long Beach WaterDepartment
<br />1800 E: Wardlow Dr„ Long Beach Ck 90807
<br />Type work: Furnish an install 4'% 6",$", A 12"Ductile bon water line. Installation of cooper service
<br />Laterals, reconnections of services, fire hydrants, and installation of valves.
<br />Contract: $1,665,824,82 completed:=lime 15,'2010
<br />Contact: Azhar ICuan 323.401-7830 consultant engineer CH2M Mill, Inspector Ed Mendoza 562-577-6560
<br />Inspector: Mike White 805-302-5375, Wendy Chen 562-570-2324 civil engineer, Supervised by Adolfo Dominguez
<br />Job Nomw Alloy Service Connection Conversion
<br />Owner: Long Beach Waterl)pl,
<br />1800 Wardlow DR., Long Beach Ca. 90807
<br />Type of Work: I", 2".3", water service connections, 4", 6", and 8 "DIP water main installation, hot tap including gate valves, and
<br />fire service installation Contract: $729,950,00 completed; 9/2009 Contact: Ed Mendoza 562-5776560, Dave Sluetzel #1714-665-
<br />4500, Supervised fly Adolfo Dominguez
<br />Job Name; 2008/2009 Water main Replacement
<br />Owner: City Of Monterey Park
<br />320 W. Newmark Ave, Monterey Pak, CA.
<br />Type of work (description): Installation of 270Lf.12", 2520LF. 8" cement mortar ductile iron pipe with fittings and appurtenances.
<br />Furnish and install now Pre hydrants and Connections,
<br />Contract. $586,847.74 comploted/09/2009
<br />Contact: Venice Bermudez$ngmecr##310-749,9309
<br />AdolphVillalpando 526-3074294 WaterllistributionSupervisor;SnporvisedbyAdolfoJ2omingu"
<br />Job Name: Artesia PilarNeighbadiood Water main Improvements
<br />Owner: City of Santa Ana
<br />20 Civic center plazas, Santa Ana, CA. 92701
<br />Type of Work (description): installation of'7028U. Of 12", 8560 Lt.. 8"., class200 AW WA c900, PVC water main. Construct water
<br />services, fire line connections, and new fire hydrant assembly
<br />ContractAnmunt. $1,858,549.60 Completed: 1/2009
<br />Contact. Ed Torres #1714-647-5018 engineer call 626-378.1372 Supervised By. Adolfo Dominguez
<br />Job Name: Water System Improvetitent
<br />Owner: City of Bell Gardens
<br />83270atfield Ave, (lorfield CA, 90201
<br />Type Of Work: (description): Installation, of40Lf, O V DIP class52, 1I80LF.$"DIP Class 52& 580Lf, DIP c1ass52, Wafer service
<br />connections, gate valves, and box, now fire hydrants.
<br />Contract Amount: $314,650.0 Completed 1212008
<br />Contact. Adolph Villapando #1562-322-5495 insp Color (engineer no longer with the city) Supervised by. Adolfo Dominguez
<br />Job Name: Edmonton Rd Water Main
<br />Owner: City of Glendale water and power
<br />141 N Glendale Ave, Glendale; CA. 91206
<br />Type of Work description) installS850UOf 8" Pressure class 350 ductile icon pipe with fillings and appurtenances. Tnrnish and.
<br />install copper tube services to now main. new fire hydrants, sewer laterals 8" & 6".gate valves, blow off assemblies,
<br />
|