Laserfiche WebLink
A <br />Storm Drain 9 Water a Sewe <br />EslaA6shed 198 <br />(714) 632075/in€o@prrolusengineoring.cef <br />PAUL.US ENGINEERING, INC. <br />PIP9UN9 CONSTRUCTION <br />PE1 Team Resume: Angelo Veron+es`[, Superintendent <br />RAIKLIo(ritpaulusen ineerin coin /M (714) 287.0561 <br />'total Years of Professional Experience: 41 ears <br />Paulus Engineering; 1 ear <br />Angelo Verone i <br />Utilities Superintendent <br />Angela Veronesi has over41 years of experience managing the construction of underground utilities and has been with <br />Paulus Engineering, Inc. 2020. His areas of expertise include stormdrain, water and sewer line installations, including large <br />diameter pipeline. He has ensured successful completion of utility work on numerous projects for Caltrans, MWD, the City <br />of Los Angeles and other public works agencies. <br />Project Experience <br />Passons Blvd Underpass, city of Pico Rivera, CA, Utilities Superintendent, $12.3M. Planned, scheduled and oversaw field <br />crews performing relocation of the sewer, storm drain and water lines. Waterline installation included up to is -Inch ductile <br />iron pipe, fire hydrants, water service connections, gate valves and air release assembly. This$12M project railroad grade <br />separation lowered Passons Blvd and constructed anew bridge for the BNSF railroad and anew pump station. The pump <br />station was 29-feet below grade at Its deepest point, and located directly adjacent to live railroad tracks. <br />Ramona Ave Grade Separation, Alameda corridor East, City of El Monte, CA, Utility Superintendent, $22.8M, Planned <br />,scheduled and oversaw field crews that constructed a 12-inch water main, high pressure gas line, extensive drainage work <br />including 72-ince RCP installation and connection structure. Water line Installation Included up to 12-Inch ductile iron pipe, <br />72-Inch reinforced concrete pipe, fire hydrants and services. This 22M grade separation project included bridges for UPRR <br />and Metrolink trains, retaining walls, Intersection Improvements and a new pump station. The pump station was 42-feet <br />below grade with two -foot: thick concrete walls. <br />,SR-91 Eastbound Lane Addition $ii-241 to SR-71, Caltrans, Corona, CA, Utilities Superintendent, $36M. Managed crews, <br />equipment and materials for installation of storm drain systems up to 60-inch diameter pipe, This $36 million project <br />widens the eastbound SR-91 freeway from SR-241 to 513-71, adding one general purpose lane and widening all lanes to <br />standard widths over approximately 4.5 miles. <br />SCRRA Eastern Maintenance Facility, Southern California Regional Rail Authority, Colton, CA, Utilities Superintendent, <br />$36M, planned, scheduled and oversaw field crews performing Installation of storm drains, waterlines, and waste water <br />lines. Facilities constructed Include a four track storage yard with capacity fmr4 six -coach trainsets, two Service and <br />Inspection (S&I) tracks, fueling and sanding service setup, a 240 foot long Train Washer, a 5,150 sfTransportation Building, <br />grading, drainage, paving, utilities, bridge construction, and other site work, One of the Ways that grutoco mitigated delays <br />to the project was to propose an alternate method of constructing the 48-inch double barrel storm drain parallel to existing <br />track. Angelo's crews performed the work round-the-clock during two, 55-hour weekend closures of Metrolink track, <br />Instead of taking the two months scheduled, the work was performed during two weekends and saved seven weeks of time <br />in the project completion date. <br />Wet €i6lily pipuPne 1`14010nuk - 2871 E, Uuaflo to St, Andeim, to 92806 • wvnv iSau[osanginea iug.(oa <br />Paulus Irijineecag, Inc. • General Engineering Cunha(lor I1024114 <br />