Laserfiche WebLink
5: Remodel Manhole Base EA 10 $SJL& `1 $C1t? s <br />(As -Needed) <br />R Construct New Manhole Net More <br />Than 8' Deep per Standard Plan <br />1201 (As -Needed) EA <br />50 $16-0 <br />$' <br />T Construct New Manhole Between <br />8'-12' Deep per Standard flan 1201 <br />(As -Needed) EA <br />10 sly 04 <br />$ 1`30 fJt7c! __w <br />8. Raise Existing Manhole Frame and <br />Cover, and replace collar to Grade <br />per Standard Plan 1201 EA <br />30 $ !, 7 W,$ <br />?0' <br />(As -Needed) <br />8. Replace Manhole Cover Concrete <br />Collar per Standard Plan 1201 <br />(As -Needed) EA <br />30 <br />10, <br />Furnish and Install Tratric Loop <br />EA <br />5 <br />sv <br />s ,7jl <br />11. <br />Provide Sewer Lateral Lining With <br />EA <br />60 <br />$ "" ti <br />$_ �0W 241 <br />Cleanout, 4" and 6" Sewer Lateral <br />Pipe (As -Needed) <br />12. <br />Provide Top Hat Repairs, 4" and 6" <br />EA <br />40 <br />$ <br />$ t s 1u <br />Sewer Lateral Pipe (As -Needed) <br />13. <br />Provide Pipe Bursting Repair with <br />Cleanout, 4" and 6" Sewer Lateral <br />Pipe per Standard Plan 1204A (As- <br />EA <br />25 <br />$ " v i <br />_ <br />Needed) <br />14. <br />Provide Open Trench <br />Repair/Replacementwith Cleanout, <br />4" end 6" Sewer Lateral Pipe per <br />EA <br />25 <br />$ t r d 3 <br />$� <br />Standard Plan 1204 (As -Needed) <br />RFP 21-036 Addendum One <br />May17.2021 <br />6of7 <br />