My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DESIGN PATH STUDIO (2)
Clerk
>
Contracts / Agreements
>
D
>
DESIGN PATH STUDIO (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2023 12:05:45 PM
Creation date
9/2/2021 2:07:16 PM
Metadata
Fields
Template:
Contracts
Company Name
DESIGN PATH STUDIO
Contract #
A-2021-118-01A
Agency
Planning & Building
Council Approval Date
7/6/2021
Expiration Date
7/5/2024
Destruction Year
2029
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B-1 <br />RFP No. 21-001 for Pre Approval Aomzory Dwelling Unit Plans <br />Design Path Studio Proposal <br />S. COST PROPOSAL (Revised 2021-08-04) <br />This proposal is for each ADU type (studio, one -bedroom, two -bedroom, and three -bedroom). <br />Each type would include reverse and mirrored Floor plans, and up to three roof and cladding design <br />variations based on Santa Ana vernacular styles. <br />At the City's request, two additional contemporary ADU building sets, with reverse and mirrored floor <br />plans, will be designed, and an Informational guide to assist homeowners with garage convertions will <br />be created. <br />:{.. 7YPOO 00p. r i,ix,iiy%'i <br />f('x;Y <br />NUP80 <br />R09EdIF$,` <br />II. <br />u <br />+,+ <br />7 . <br />Studio, One -bedroom, Two -bedroom, and <br />Three -bedroom <br />1 <br />$15,000 <br />2 <br />$30,000 <br />3 <br />$45,000 <br />4 <br />$60,000 <br />AddltlonM items; <br />Contemporary (unit sizes TBD) 2 $30,000 <br />Garage Conversion Guide $io,000 <br />Design Path Studio anticipates completion of all project tasks and closeout of the project by January, <br />2022 (see Project Schedule). Any additional services requested by the City of Santa Ana for the <br />remainder of the contract terms will be billed based on the hourly rate(s) provided. <br />Contract Year-1: $100,000 <br />Contract Year-2: as needed hourly <br />Contract Year-3: as needed hourly <br />Extension: as needed hourly <br />Hourly Fee Schedule: <br />Principal Architect: <br />$175/hr <br />Principal Planner: <br />$150/hr <br />Project Manager: <br />$100/hr <br />Designer: <br />$75/hr <br />Drafter: <br />$75/hr <br />REVISD BUDGET NOT TO EXCEED: <br />$100,000 <br />REVISED ESTIMATED COMPLETION DATE: 3anuary, 2022 <br />Design Path Studio + checkerboardSTUDIOS - Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.