Laserfiche WebLink
Exhit <br />1 <br />Pre-Design/Start Up Meeting <br />6 <br />s <br />2 <br />Conceptual Plan 30% , 3D Exhibit / Final Schedule <br />24 <br />6 <br />2 <br />12 <br />4 <br />6 <br />20 <br />60 <br />1 2 <br />3A <br />Topographic Survey <br />2 <br />2 <br />$ 10,500 <br />3B <br />Record Mapping - <br />3 7500 <br />4 <br />Geotechnical Investigation and Report <br />2 <br />1 <br />5 <br />PreliminaryHydrology and Hydraulics Analysis <br />2 <br />2 <br />2 <br />24 <br />8 <br />40 <br />6 <br />Public Outreach and Project Meetings <br />32 <br />12 <br />12 <br />16 <br />24 <br />7 <br />Design Develo menl Plans 60% <br />24 <br />8 <br />2 <br />40 <br />24 <br />24 <br />36 <br />40 <br />2 <br />8.1 <br />18ite Plan <br />8 <br />6 <br />1 <br />1 8 <br />30 <br />2 <br />8.2 <br />ISite Utility Plan and Coordination <br />2 <br />2 <br />1 2 <br />12 <br />14 <br />4 <br />2 <br />8.3 <br />Horizontal Control Plans <br />2 <br />2 <br />1 1 <br />8 <br />12 <br />4 <br />2 <br />8.4 <br />Grading and Drainage Plans <br />2 <br />2 <br />1 2 <br />24 <br />40 <br />8 <br />2 <br />8.5 <br />Alley Improvement Plans <br />1 <br />2 <br />2 <br />16 <br />32 <br />8 <br />8.6 <br />WQMP <br />1 <br />1 <br />2 <br />16 <br />24 <br />2 <br />8.7 <br />Erosion Control Plan <br />1 <br />1 <br />2 <br />8 <br />4 <br />2 <br />8.8 <br />Site Amenities Plan <br />16 <br />2 <br />16 <br />36 <br />2 <br />8.9 <br />Skate Park Plan <br />6 <br />2 <br />1 <br />1 <br />1 6 <br />8.10 <br />Planting Plan <br />4 <br />2 <br />4 <br />32 <br />8.11 <br />Irrigation Plan <br />4 <br />1 2 <br />24 <br />40 <br />2 <br />8.12 <br />lElectrical Plans <br />4 <br />1 <br />8.13 <br />Construction Details <br />8 <br />2 <br />2 <br />2 <br />8 <br />4 <br />8 <br />12 <br />24 <br />2 <br />8.14 <br />Technical Specifications <br />a <br />4 <br />8 <br />10 <br />4 <br />10 <br />6 <br />8.15 <br />Independent Final Opinion of Probable Cost <br />3 <br />2 <br />2 <br />2 <br />a <br />10 <br />2 <br />10 <br />8.16 <br />Plan Submittals, Approval Process, and Permitting <br />8 <br />2 <br />4 <br />8 <br />12 <br />4 <br />12 <br />2 <br />8.17 <br />Final Colored Rendering <br />2 <br />1 <br />4 <br />24 <br />Optional Tasks / Construction <br />9 Bid Advertisement <br />6 <br />4 <br />2 <br />2 <br />4 <br />2 <br />10 Construction Administration <br />16 <br />4 <br />16 <br />a <br />8 <br />2 <br />6 <br />11 ; S Built Plans <br />3 <br />2 <br />1 <br />2 <br />1 8 <br />6 <br />4 <br />16 <br />Please note that scope and tee are negotiable. <br />Reimbursables included (orbudgetary purposes only. <br />Greyed out areas are not included in the total cost <br />