Laserfiche WebLink
Density Bonus Agreement No. 2020-02, FX Residences <br />March 22, 2021 <br />Page 7 <br />5 <br />6 <br />8 <br />When analyzed cumulatively, the three requested concessions could be avoided if the <br />project were designed on a different site, using a different site plan, or constructed using a <br />different type of construction (steel-frame/Type I versus wood/Type III). If the project were <br />designed with a multi-level parking and/or subterranean parking structure, or if the applicant <br />used different building materials to construct a taller project, additional area on site would <br />become available to provide open space and parking, and would allow the project to meet <br />the required tree requirements. However, these changes would increase development costs <br />and result in a project that would exceed the maximum permitted building height, resulting <br />in the affordable housing project becoming financially infeasible due to the significantly <br />increased financial implications of an alternative construction type compared to the relatively <br />smaller scale of the project (17 residential units). <br />Based on the analysis provided within this report, the proposed development will materially <br />assist in accomplishing the goal of providing affordable housing opportunities in the city and <br />will consistent with the purpose of the underlying zone and applicable designation in the <br />general plan land use element. In addition, the proposed deviations are necessary to make <br />the project economically feasible for the applicant to utilize a density bonus authorized for <br />the development pursuant to section 41-1603. <br />Economic Development Benefits <br />The project would contribute to creation of local temporary and permanent job <br />opportunities for construction and supportive housing services (e.g., onsite manager, <br />support staff, etc.). Specifically, the project would require one full-time House Case <br />Manager/Residential Services Coordinator and part time (four hours per week) general <br />management services. The full-time and part-time job will part of the services provided by <br />Mercy House, who provides housing and comprehensive supportive services for a variety <br />of homeless populations. In addition, the construction of the project will require payment <br />of permit fees to the City. <br />Public Notification and Community Outreach <br />Pursuant to SAMC Section 41-636 and California Government Code Section 65091, notice <br />of this public hearing was given at least 10 days prior to the hearing in the following ways: <br />(1) mailed to property owners and occupants within at least 500 feet of the project site and <br />other interested parties, (2) published in the Orange County Reporter, and (3) physically <br />posted at the project site. <br />The applicant held a Sunshine Ordinance community meeting on the evening of Tuesday, <br />October 8, 2019, at the Santa Ana Regional Transportation Center from 5:30 to 8:30 p.m. <br />This meeting was publicly noticed in the OC Reporter, posted on the City’s website, and <br />invitation mailers were sent to all owner and occupants within a 500-foot radius of the project <br />site, as well as local community organizations. The meeting was designed as an “open <br />house” forum with presentation boards and workstations where staff members from <br />City Council 2 –7 3/22/2021