My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEBER WATER RESOURCES CA, LLC
Clerk
>
Contracts / Agreements
>
W
>
WEBER WATER RESOURCES CA, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:42:57 AM
Creation date
9/21/2021 4:22:52 PM
Metadata
Fields
Template:
Contracts
Company Name
WEBER WATER RESOURCES CA, LLC
Contract #
A-2021-161-03
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/16/2024
Insurance Exp Date
5/1/2024
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEBER <br />WATER RESOURCES <br />Project Approach/Methodolo <br />Weber Water Resources CA, LLC ("Weber Water Resources"), a limited liability company, has been providing <br />the widest range of water resources solutions with the lowest risk to clients for nine (9) years. Weber Water <br />Resources has two (2) additional locations in Arizona providing service for over 100 years. Weber Water <br />Resources is able to partner with public and private clients to achieve the most desirable results possible. <br />When problems are present, solutions are what Weber Water Resources provides. Our unique approach to <br />handling our clienteles' needs is showcased through our project manager's ability to develop a personal <br />relationship with each client to better understand the needs and scope of each project. A plan tailored to deliver <br />maximum results is overseen by your project manager from inception to completion. Within 24 hours our firm <br />can mobilize and deploy to a request for emergency service. <br />With a state-of-the-art database to track essential components of your water system infrastructure, documented <br />quality control processes and over 1400 hours annually of continual education among staff, Weber Water <br />Resources truly provides solutions in the water resource industry at the lowest risk possible. <br />Weber Water Resources is organized internally specifically for the multiple -project and timely construction nature <br />of on -call projects. Within our recent experience, we have completed multiple on -call contracts that entail the <br />maintenance and service for municipalities and county requirements and have demonstrated capacity to perform <br />the required services. Also, the proposed team at Weber Water Resources has successfully completed the <br />construction and installation of projects with similar scopes of work as outlined within the RFP. <br />With a staff of more than 70 employees, Weber Water Resources has the resources to support your project <br />needs. Tony McBee will lead the project to ensure the work is completed correctly and timely. Tony has more <br />than 30+ years of experience in the water and wastewater industry. His experience with pumping plant <br />equipment includes installation of new equipment, repair of existing equipment, applications and engineering, <br />design -build and project management in deep -well vertical turbines, booster and process equipment <br />applications. <br />Weber Water Resources machine shop is located within our 10,000 sq. foot facility in Corona, CA. Our <br />machining capabilities allow us to perform the necessary tasks required to support pump repairs, including <br />turning, boring, threading (internal and external), drilling and milling operations. In addition to disassembly, <br />inspection, prep and assembly work, typical shop work involves fabrication of shafting, enclosing tubes, bearings <br />and restoring casings (bowls and impellers) to their original or specific tolerances. <br />Weber's approach to each project is to tailor a specific plan to achieve maximum results with the ultimate goal of <br />maximizing the life of the clients' asset. Each project starts with a meeting between the Project Manager and <br />Client. The Project Manager will gather all historical documentation, including recent changes to pumping <br />production, water levels and/or water quality to help provide an appropriate remedy to maximize the well yield. <br />The Project Manager will evaluate the documentation and conditions present. Upon completion of the Project <br />Managers evaluation, a detailed scope of work will be provided to the District. Weber will communicate <br />throughout the project to ensure the District personnel is aware of progress. Upon completion of the work, <br />Weber will conduct a post -project inquiry with the District to better understand how we performed. We want to <br />capitalize on the areas we excel in and improve any areas where the client was not satisfied — if present. <br />
The URL can be used to link to this page
Your browser does not support the video tag.