My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRUSTAR ENERGY LLC
Clerk
>
Contracts / Agreements
>
T
>
TRUSTAR ENERGY LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2021 2:44:29 PM
Creation date
9/24/2021 2:42:59 PM
Metadata
Fields
Template:
Contracts
Company Name
TRUSTAR ENERGY LLC
Contract #
A-2021-147
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/16/2022
Insurance Exp Date
6/2/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Time -fill System Inlet Filters <br />Two inline coalescing filters shall be connected above ground to the pipe or stainless <br />steel tube at the inlet to the time -fill system. The two coalescing filters shall capture <br />aerosol and solid particles greater than 0.6 microns and 0.2 microns, respectively. Each <br />filter shall have a design pressure not less than 5000 psig. Filter element replacement <br />shall be performed without removing the connection piping or tubing. Filters shall be <br />Parker Finite J2 or approved equal with a block and bleed drain system installed on <br />each filter housing. Filter housings shall be installed with double ferrule fittings. <br />City of Santa Ana- RFP 20-095 <br />CNG Fuel Station: Design, Build, Operate and Maintain <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.