My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRUSTAR ENERGY LLC
Clerk
>
Contracts / Agreements
>
T
>
TRUSTAR ENERGY LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2021 2:44:29 PM
Creation date
9/24/2021 2:42:59 PM
Metadata
Fields
Template:
Contracts
Company Name
TRUSTAR ENERGY LLC
Contract #
A-2021-147
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/16/2022
Insurance Exp Date
6/2/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TruStar <br />Energy CNG <br />maximize the entire systems capabilities and ensure trucks get the maximum allowable CNG on board <br />with each fill. <br />Micromotion CNG050 Meter- 4 - Included <br />Micromotion Meter CNG050 - 40 to 4444 scfm capacity constructed of stainless steel, pressure rated to <br />5,000 psi. Temperature rated from -40OF to +247°F. Mass flow accuracy to ± .5%. Rated for hazardous <br />area installation. Weights and Measures rated. Reads in liters, DGE, or GGE. All-weather rated. <br />20' Dual -Head LED Parking Lot Light- 1 Included <br />A dual 400-watt LED lamp mounted on a one-piece aluminum post. Each lamp enclosure measures 15" <br />x 22". This light post includes dual LED lamp enclosures. The light post is 20' in height and mounted in a <br />18' concrete caisson. <br />Start Up and Commissioning- Included <br />TruStar Energy will commission the station and provide on -site training on equipment to mechanics that <br />will include all maintenance and operations requirements. Mechanic will work with TruStar Energy <br />trainer during start up to understand all required maintenance and operations requirements. <br />Pricing and RNG Credit Summary: <br />Phase 1 <br />Design, Engineering & Permits: $104,339.80 <br />Total Phase 1 Contract Price: $104,339.80 <br />Phase 2* <br />Equipment Procurement: <br />$778,351.14 <br />Phase 2 - Equipment <br />Construction & Installation: <br />$1,172,982.50 <br />Phase 2 - Construction <br />Project Management & Commissioning: <br />$239,168.59 <br />Phase 2 - Construction <br />Freight & Mobilization: <br />$33,750.00 <br />Phase 2 - Equipment <br />RNG Credit/Lump Sum: <br />($540,000.00) <br />Total Phase 2 Contract Price: <br />$1,684,252.23 <br />*Phase 2 pricing expires June 30"', 2021 and will be revised to reflect cost increases incurred, if any, by TruStar <br />Energy. Phase 2 will commence upon manual agreement of updated pricing and receipt Notice to Proceed. <br />TruStar Energy will receive all RNG credit value up to 110,000 GGE per year for 10 years. <br />Actual usage will be audited at the end of each calendar year by TruStar Energy and verified by City of Santa <br />Ana. RNG credits will be reconciled as follows: <br />- TruStar Energy will pay City of Santa Ana $0.67/GGE for all volume over 110,000 GGE annually. <br />- City of Santa Ana will pay TruStar Energy $0.67/GGE for any shortfall of volume below 110,000 GGE <br />annually. <br />-v4er energy - 10245 PhlaOelphla autl Ranpha Cugamooga 3 -3p- eox §_-3-,C 3, aoecap30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.