My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRUSTAR ENERGY LLC (2)
Clerk
>
Contracts / Agreements
>
T
>
TRUSTAR ENERGY LLC (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2021 2:49:06 PM
Creation date
9/24/2021 2:45:36 PM
Metadata
Fields
Template:
Contracts
Company Name
TRUSTAR ENERGY LLC
Contract #
A-2021-148
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/17/2026
Insurance Exp Date
6/2/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SERVICE AGGREEMENT — All INCLUSIVE 100% WARRANTY <br />• Visually inspect tubing, piping and valves for leaks and abnormalities <br />• Check and drain inlet filters <br />• Check valve sequencing <br />• Visually inspect all pressure relief devices for signs of failure or leakage. <br />• Verify ESD control functions and safety equipment <br />• Verify on/off switch operations <br />• Verify ESD control functions <br />• Verify 4,250-psig maximum fill pressure limits <br />Dispensers — Time Fill <br />• Visually inspect tubing, piping and valves for leaks and abnormalities <br />• Check and drain inlet filters <br />• Verify ESD control functions and safety equipment <br />Methane Gas Detection Sensors <br />• Verify and test operations <br />• Test equipment to meet OEM design criteria <br />• Repair and replace defective equipment <br />Inlet Gas Dryer <br />• Monthly - Drain pre -filter, blower housing and sump <br />• Monthly - Check differential pressure across pre -filter and after -filter elements. Replace if required <br />when gauge is approaching Red zone or 3-5 PSID <br />• Monthly - Check dewpoint for reading below 40F. If above, then regenerate dryer <br />• Monthly -Check and maintain operating conditions: pressure, flow, temperature within the design <br />parameters of the dryer. <br />• Six Month — Recalibrate/check span of moisture analyzer. <br />• Six Month — Replace pre -filter, after filter and separator elements if needed. <br />• Annually — Regenerate dryer, check regeneration cycle to ensure working properly <br />• 1000 hours —change oil in blower <br />2000 Hour intervals <br />• Post compression coalescing filter element replacement. <br />• Compressor frame oil replacement (Crankcase Oil) <br />• Compressor frame oil replacement (Crankcase Oil Filter) <br />• Compressor oil strainer element cleaning. <br />• Force feed lubricator box lube oil replacement. <br />• Force feed lubricator filter replacement. <br />• Compressor interstage coalescing filter element replacement. <br />• Driver motor lubrication (Grease bearings per manufactures recommendations) <br />3000 Hour Intervals <br />• Post compression coalescing filter element replacement. <br />10225 Phdadelpho Court One North Lexington Awnue 192832nd Awe NW <br />Poncho Cucamonga CA 91730 White Rains. New York I W1 Rochester. MN 55901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.