My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUTHIE POWER SERVICES
Clerk
>
Contracts / Agreements
>
D
>
DUTHIE POWER SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 11:49:08 AM
Creation date
9/27/2021 4:54:11 PM
Metadata
Fields
Template:
Contracts
Company Name
DUTHIE POWER SERVICES
Contract #
A-2021-164-01
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/16/2024
Insurance Exp Date
3/15/2023
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 21-034 <br />ON -CALL EMERGENCY GENERATOR MAINTENANCE AND REPAIR SERVICES <br />Contractor Responsibilities: <br />I, TIER I: PREVENTATIVE MAINTENANCE (REFER TO BID ITEMS 1 THROUGH 6) <br />Upon request, Tier I Maintenance Services shall be performed by the Contractor. Tier I <br />generator maintenance services shall at a minimum include checking the following: <br />Fuel (Check main and day tank fuel supply levels; day tank float switch; piping, hoses <br />and connectors; operating fuel pressure; and for any obstructions to tank vents and <br />overflow piping) <br />2. Lubrication system (Check for proper oil level and oil operating pressure; lube oil <br />heater) <br />3. Cooling system (Check coolant level, water pump(s), jacket water heater, belts, hoses, <br />fan) <br />4. Exhaust system (Check drain condensate trap and for possible leakage) <br />5. Battery System (Look for possible corrosion; check specific gravity, electrolyte level and <br />battery charger — maintenance -free batteries require routine visual inspection and <br />maintenance in accordance with manufacturer's instructions) <br />6. Electrical system (Conduct a general inspection of wiring and connections; check circuit <br />breakers/fuses) <br />Prime Mover/Generator (Check for debris, foreign objects, loose or broken fittings; <br />check guards and components; look for any unusual condition of vibration, leakage, <br />noise, temperature or deterioration) <br />S. Thirty (30) Minute Load Test (Contractor shall carry out 30-minute generator load tests <br />and run the generator at 30%for a minimum of 30 minutes. If a generator does not "pass" <br />the load test consistently then Contractor will ask the City of Santa Ana if a resistive load <br />bank test should be performed.) <br />Within five (5) business days of completing a load test on a generator and maintenance <br />inspection services, Contractor shall provide a completed Tier 1: Generator 30-Minute Load <br />Test Form found in APPENDIX A (or City approved alternative) to the City of Santa Ana. The <br />Contractor shall state all findings, if any, along with a proposed scope of work and complete <br />cost estimates for any recommended equipment repairs and/or replacement. Alternative <br />reporting forms may be used if approved by the City of Santa Ana. <br />U. TIER 2: PREVENTATIVE MAINTENANCE (REFER TO BID ITEMS 7 THROUGH 12) <br />Upon request, Tier it Maintenance Services shall be performed by the Contractor. In addition <br />to the items listed in APPENDIX B (the TIER II: GENERATOR INSPECTION AND <br />PREVENTATIVE MAINTENANCE CHECKLIST), the Tier II maintenance service visit shall <br />include a full change of engine oil and filter (along with a battery and coolant replacement if <br />
The URL can be used to link to this page
Your browser does not support the video tag.