Laserfiche WebLink
TUSTIN AVENUE/ROSE DRIVE <br />RTSSP GRANT APPLICATION OCTOBER 2019 <br />SECTION 1: KEY TECHNICAL INFORMATION <br />a. The proposed project will synchronize Tustin Avenue/Rose Drive corridor from First Street in Santa Ana to <br />Wabash Avenue in Yorba Linda. The project includes fifty-four (54) signals over eleven and four tenths (11.4) <br />miles. Figure 1 shows a map of the project area. <br />26 <br />25 <br />24 <br />23 <br />22 <br />21 <br />20 <br />19 <br />18 <br />17 <br />16 <br />15 <br />14 <br />13 <br />12 <br />11 <br />10 <br />9 <br />8 <br />7 <br />6 <br />1 34 5 N <br />54 <br />53 <br />52 <br />51 <br />50 <br />49 <br />48 <br />47 <br />46 <br />45 <br />44 <br />43 <br />42 <br />41 <br />40 <br />39 <br />38 <br />37 <br />36 <br />35 <br />34 <br />32 <br />31 <br />30 <br />3329 <br />;, <br />;28 <br />N <br />27 <br />Figure 1: Signalized intersection and proposed project limits. <br />1 <br />Rev 1: 4/7/2021 <br />Page 1 of 23 <br />