My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STATE OF CALIFORNIA TRANSPORTATION COMMISSION
Clerk
>
Contracts / Agreements
>
S
>
STATE OF CALIFORNIA TRANSPORTATION COMMISSION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2021 3:06:34 PM
Creation date
10/8/2021 3:00:27 PM
Metadata
Fields
Template:
Contracts
Company Name
STATE OF CALIFORNIA TRANSPORTATION COMMISSION
Contract #
A-2021-026
Agency
Public Works
Council Approval Date
3/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> . •• Santa Clara Bicycle and Pedestrian Improvements-,$3.243 ntillidn <br /> • Bus$top IMprgvernents on Routes.53/55B(Bravo! Main.•street)'$0.344 million <br /> Thetbtai•SCCP program award remalns'the•same. <br /> Technical Changes <br /> Bravo! Main Street--FlveZero-Emission Buses <br /> • Change front hydrogen fuel-cell•td battery electric, With the.changes in the State mandates,UCTA <br /> needs•to accelerate'testing between:zero-emission technologies. There Is no impact to benefits <br /> as battery-electric buses are.still zero-ern Mon, <br /> Project Prograinralnig Requests Updates <br /> WarnerAvenue•Signal Syneh'ronization'=.$4.092 Million <br /> • Updates tcusched Ole to rnatcb allocation,contract award,and equal CEQA filing, <br /> • Up'dates to the Project Manager/Contacts: Original t?rpJect Manager retired. <br /> • Add "Design-Build" ih scope. This pidj*otwas approved as,a design build in the application, • <br /> hditigerAvenue:Signal Synchronization-$4.957 million. <br /> • Updatesto schedule to'match allocation, contract award.,and actual CEQA filing. <br /> • Updates to the Project Manager/Contacts. Original Project Manager retired.. <br /> 1. Add"'D'esign-Biiild"in'scope. This proJect'wes approved bf;a.design build i:7'the application, <br /> MacArthur Boulevard/Talbert Avenue Signal5ynthronizati'on•-$2'.951 Millie n' <br /> t 1 <br /> • Updates tq•sehedufe tp,match,aliocaticn,contract.award,end actual CEQA fIir13. . j i <br /> • Updates'tathe P"rpjectManager/Contacts, Original Project Menagerretired. <br /> • Add"Design-Build"in`Scope, This project was-approved as.a design'build in the'applieation, <br /> BravolMainStreet—Five'Zerc ttissioh Buses-$4.30MRlibn i <br /> • Updates:to scope from Hydrogen Fuel-00i1,to Battery-Electric, <br /> • Updates sche'dule'to advance projett <br /> • No changes to benefits as both fuel types are zero-.omission.. <br /> Add the following Project Programming Requests, • ' <br /> • Santa Clara gicycle;and Pedestrian Improvements-$3.z.4,3million <br /> • .Bus Stop improvements on'"Routes'59/553;(BraVol Main Street)-$0.344 milltori <br />
The URL can be used to link to this page
Your browser does not support the video tag.