Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.; 21.059 <br />WATER WELL, PUMP AND MOTOR REHABILITATION AND REPAIR SERVICES <br />All testing, inspections and incidentals related to required reports shall be considered included within the bid <br />items for said testing report and no additional compensation shall be allowed, <br />12. MINIMUM QUALIFICATIONS <br />a. All electric motor repair shops shall be EASA Accredited and shall provide a copy of the certification upon <br />request by the City. Failure to provide a sUb•contractor that is an EASA Accredited Member as a <br />part of the proposal may be grounds for proposal rejection, <br />b. Contractor or Contractor's subcontractor shall be certified as an UL Facility and shall provide a copy of <br />the certification upon request by the City. <br />c. Contractor shall be responsible for obtaining all original equipment manufacturer (OEM) technical <br />documents, drawings and parts when necessary. <br />d. Contractor shall have all engineering, design, metalizing, welding, heat treating, machining, balancing, <br />calibrating and testing capabilities necessary to completely refurbish/rewind electric motors. <br />e. Equipment used for inspecting, calibrating and testing pumps and motors shall be up-to-date and have <br />calibration certificates, less than one year old, traceable to National Institute of Standards and <br />Technology (NISI) standards where applicable. <br />13, SECURITY REQUIREMENTS <br />Public Works Agency field representative will unlock the Public Works Agency facilities entry gates on <br />the first day of work to allow Contractor access. Contractor shall then supply their own padlook(s) for some <br />entry gates as specified by the Public Works Agency. Contractor's padlock(s) shall lock onto the Public <br />Works Agency's padlock connecting to the chain -link, which enables both the Public Works Agency field <br />representative and Contractor to unlock the entry gates. After completion of work, padlock(s) shall be <br />removed by the Contractor. <br />Contractor and/or subcontractors shall notify the Public Works Agency field representative upon arrival and <br />departure to or from jobsite. <br />14. PARTS, MATERIALS AND WARRANTIES <br />The Public Works Agency will reimburse the Contractor for the cost of repair parts, materials, and <br />replacement equipment, plus 15 percent markup, provided the Contractor has obtained the City's prior <br />written approval of Contractor's written estimate. All replacement equipment shall be approved by the <br />Public Works Agency prior to the purchasing of the equipment. The Contractor shall provide manufacturer <br />documentation to the Public Works Agency for any replacement equipment. The Contractor shall submit <br />an invoice with attached applicable receipts for a particularjob to the Project Manager. <br />The Contractor shall assure that all materials, parts, and workmanship supplied shall be free from original <br />or developed defects. Contractor shall provide a minimum of one year warranty for materials and parts and <br />thirty days on workmanship, Should original or developed defects and/or failures appear within the <br />minimum warranty of one year after work completion, Contractor shall, at its expense, rectify such defects <br />and/or failures and make all replacements and adjustments that are required. <br />Corrective work shall be performed by the Contractor and given the highest priority after Public Works <br />Agency's notification to do so, and shall be completed to the satisfaction of the Project Manager. The <br />Contractor shall proceed diligently to complete said work within the time allotted as approved by the Project <br />Manager. <br />