My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL PUMP COMPANY, INC.
Clerk
>
Contracts / Agreements
>
G
>
GENERAL PUMP COMPANY, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 7:45:21 AM
Creation date
10/8/2021 4:01:24 PM
Metadata
Fields
Template:
Contracts
Company Name
GENERAL PUMP COMPANY, INC.
Contract #
A-2021-161-01
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/16/2024
Destruction Year
2029
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 21-059 <br />WATER WELL, PUMP AND MOTOR REHABILITATION AND REPAIR SERVICES <br />of well section under water & perforations <br />EA <br />1 <br />3,200 <br />3,200 <br />tment during wire brushing (optional) s <br />F&dispose <br />LS <br />1 <br />12,000 <br />12,000 <br />of all dirt & debris (if needed) <br />LS <br />1 <br />2,5002,500 <br />perforations (1015 Feet) <br />LS <br />1 <br />6,000 <br />6,000 <br />TOTAL <br />- <br />$140,750.00 <br />Proposed new pump: Make: Hydrono, Model No.: 14HL , GPM: 2800 , TDH: 280 , Eff.: 82% <br />1. Contractor must include all costs involved in accessing the equipment including removal of pump <br />through the building hatch and or working around building roof and hatch. Please refer to Appendix <br />A for a site map as reference. <br />2. Contractor to provide pump curve, lead time for procurement of parts along with turn <br />around/completion date. 6 weeks based on scope. See pump curve attached <br />3. Chemical treatment during wire brushing will not be used in the evaluation of the bids. If chemical <br />treatment is applied, the bid price must include cost of the chemicals, chemicals handling (application & <br />mixing), used chemicals neutralization and disposal. <br />4. New Stainless Steel line for sounding will be provided and installed, with necessary mounting brackets, <br />and one gauge calibrated for sounding. <br />5. Sound attenuation shall be required for major work. Sound attenuation for engine noise shall be limited <br />to a maximum of 75 dB(A) at 23 feet when operating at full rated load. Sound proofing solution to be <br />approved by the Project Manager. <br />schedule. Contractor's labor and equipment rate sheet shall list rates for all labor <br />designations, equipment and materials. <br />BIDDER INFORMATION: <br />Legal Company Name: General Pump Company, Inc. <br />Complete address: 159 N. Acacia Street, San Dimas, CA 91773 <br />Phone Number: 909-599-9606 <br />Email Address: <br />Authorized Sigm <br />Name: Michael Bodart <br />Title: President / Director of Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.