Laserfiche WebLink
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 16-7566 Raitt-Myrtle Park Change Order Number <br />To CEM Construction Corporation Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise slated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by <br />JUSTIFICATION <br />PUBLIC WORKS AGENCY <br />1. To compensate the contractor for costs associated with adjusting 2 water valves per PCO <br />24.1 dated September 27, 2023. <br />TOTAL COST = $3,497.43 <br />2. To compensate the contractor for costs associated with extra work due to pavement marking <br />changes per PCO 27.1 dated September 27, 2023. <br />TOTAL COST = $3,553.80 <br />3. To compensate the contractor for costs associated with upgrading the irrigation controller from <br />Rainbird to Calsense per PCO 19.0 dated June 4, 2023. <br />TOTAL COST = $7,145.19 <br />4. To compensate the contractor for costs associated with repairs of the CMU wall on the East <br />side of the project per PCO 23.1 dated September 27,2023. <br />TOTAL COST = $4,344.07 <br />5. To compensate the contractor for costs associated with extra work to the pump station such as <br />running new electrical wire, and installing new discharge lines, pump house manhole, 2 pumps, <br />and a new concrete culvert per PCO 9.4 dated May 4, 2023. <br />TOTAL COST = $106,866.28 <br />6. To compensate the contractor for costs associated with installing a new historical marker per <br />PCO 14.1 dated June 28, 2023. <br />TOTAL COST = $7,870.46 <br />7. To compensate the contractor for costs associated with Installing new security cameras per <br />PCO 28.0 dated November 2, 2023. <br />TOTAL COST = $41,379.06 <br />To compensate the contractor for costs associated with installing a new security cage around <br />the electrical meter per PCO 29.0 dated November 8, 2023. <br />TOTAL COST = $4,727.61 <br />TOTAL AGREED COST: $179,383.90 <br />Page 1 of 2 <br />