Laserfiche WebLink
<br /> <br />Page 10 <br />Proposal for Engineering & Traffic Survey for Speed Limits Update - RFP No. 21-002 <br /> <br />Project Schedule <br /> <br />AGA’s proposed project schedule, shown below, has been prepared considering all the <br />requirements for the study detailed in the RFP in estimating the time required to complete the <br />project. AGA has adequate staff resources to provide a Draft Report to the City of Santa Ana <br />within twelve to fourteen weeks from receipt of the notification to proceed, and a Final Report to <br />the City within two weeks of receipt of the written consolidated comments on the Draft Report. <br /> <br />Given the recently adopted changes in the California Vehicle Code relative to raising or lowering <br />speed limits, and the potential for questions relative to speed limit modifications resulting in the <br />need for multiple presentations at the Commission/Council level, our expedited Project <br />Schedule will allow adequate time for these presentations and ensure that the current extended <br />seven-year validity between speed surveys will not lapse. <br /> <br />AGA will coordinate with the City prior to data collection to ensure that no planned construction <br />work or other events will potentially impact the scheduled data collection. <br /> <br /> <br /> <br />City Council 17 –52 10/19/2021