Laserfiche WebLink
All brochures, mailings, and other educational materials are to be approved by the City <br />in advance of distribution, and shall bear the City seal, unless otherwise approved by <br />the City. <br />5.3.4 Community Events <br />At the direction of City, Contractor shall participate in and promote Recycling and <br />other Diversion techniques at a minimum of four (4) community events per calendar <br />year. Such participation would normally include providing, without cost, Collection <br />and educational and publicity information promoting the goals of City's Solid Waste <br />program. The City reserves the right to modify the required events and Contractor's <br />participation requirements. <br />5.3.5 Media Relations <br />Contractor shall notify the City of all requests for news media interviews related to the <br />City's Solid Waste Handling Services within twenty-four (24) hours. Before responding <br />to any inquiries, Contractor will discuss the proposed response with the City. Copies of <br />draft news releases or proposed trade journal articles shall be submitted to City for <br />prior review and approval at least two (2) working days in advance of release. Copies of <br />articles resulting from media interviews or news releases shall be provided to the City <br />within five (5) days after publication. <br />5.4 Waste Generation/Characterization Studies <br />Contractor acknowledges that City must perform Solid Waste generation and Disposal <br />characterization studies periodically to comply with AB 939 requirements. Contractor <br />agrees to participate and cooperate with City and its agents and to accomplish studies <br />and data collection and prepare reports, as needed, to determine weights and volumes <br />of Solid Waste and characterize Solid Waste generated, disposed, transformed, diverted <br />or otherwise handled/processed to satisfy AB 939 requirements. <br />5.5 Contamination Monitoring <br />5.5.1 Contamination Inspection Methods <br />Contractor shall implement an inspection method in compliance with the requirements <br />of SB 1383 (14 CCR Section 18984.5), as described below. Contractor shall include the <br />contamination inspection method that will be utilized in the "AB 341, AB 827, AB 1826, <br />August 17, 2021 102 City of Santa Ana <br />