My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REPUBLIC SERVICES
Clerk
>
Contracts / Agreements
>
R
>
REPUBLIC SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2024 4:28:45 PM
Creation date
10/28/2021 4:12:07 PM
Metadata
Fields
Template:
Contracts
Company Name
REPUBLIC SERVICES
Contract #
A-2021-171
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
6/30/2032
Insurance Exp Date
6/30/2025
Destruction Year
2037
Notes
For Insurance Exp. Date see Notice of Compliance
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Service or "Pull" Component <br />Step One - Calculate the percentage increase or decrease in the Service and Fuel <br />components for "Pull Fee Per Load - All Types and Sizes" listed in Section 6.4.2. The <br />increase or decrease in the rate adjustment indices for Service and Fuel components will <br />be for the change in the average annual published indices for the twelve (12) month <br />period ending December prior to the July 1 when the rate change will take effect. <br />Step Two - The first rate adjustment cost components as a percentage of total costs are <br />provided in Section 6.4.2 above, with subsequent components calculated in Step Four of <br />the rate adjustment. For Step Two of each subsequent rate adjustment, use the cost <br />components recalculated in Step Four during the previous rate adjustment. <br />Multiply the percentage changes for each rate adjustment component by that <br />component's weighting and add these resulting percentages together to get the total <br />weighted change to the rates. <br />Step Three - Multiply the total weighted percent change from Step Two by the existing <br />Pull Per Load - All Types and Sizes rate to calculate the increase or decrease to the <br />maximum rate. Then add (subtract) the change in rates to (from) the existing maximum <br />rates to determine the new maximum rates. <br />Step Four - Recalculate weightings for the following year based on these changes. <br />Roll -Off Tonnage Charge <br />Step One - Calculate the percentage increase or decrease in the tonnage component for <br />"Roll -Off Tonnage Charge" listed in Section 6.4.2. The increase or decrease in the rate <br />adjustment indices for the tonnage component will be for the change in the average <br />annual published indices for the twelve (12) month period ending December prior to <br />the July 1 when the rate change will take effect. <br />Step Two - Multiply the percent change from Step One by the existing tonnage rate to <br />calculate the increase or decrease to the maximum rate. Then add (subtract) the change <br />in rates to (from) the existing maximum rates to determine the new maximum rates. <br />Note: Under the Waste Disposal Agreements (WDA) with Orange County Waste and <br />Recycling, the per ton gate rate, which is a portion of the "Roll -Off Tonnage Charge, is <br />adjusted annually based on the increase or decrease in the Consumer Price Index for All <br />August 17, 2021 116 City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.